My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-06_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2014-10-06_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:31 PM
Creation date
10/6/2014 1:51:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
10/6/2014
Doc Name
Midterm Review Midterm/Cost Estimate (MT4)
From
DRMS
Permit Index Doc Type
Findings
Email Name
SLB
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine (C- 1996 -083) <br />MT- 4 <br />Revision <br />Type and <br />Sequence <br />Description <br />Status <br />Decision <br />Date <br />TR -85 <br />Gob Pile #2 Drying Area <br />Approved <br />4/14/2014 <br />TR -86 <br />Ten GVB and Three Exploration Holes <br />Approved <br />4/21/2014 <br />TR -87 <br />Expand Pond D, Relocate E & W Diversion Ditches <br />Approved <br />09/15/2014 <br />TR -88 <br />Clean Water Diversion Ditch — Gob Pile #3 <br />Approved <br />6/4/2014 <br />TR -89 <br />Relocate E & W Diversion Ditches <br />Approved <br />8/21/2014 <br />TR -90 <br />New GVB -B17F and -B19C and Relocation of —B15A <br />Approved <br />7/7/2014 <br />TR -91 <br />Drainage /SAE Map Updates <br />Under <br />Review <br />TR -92 <br />Alternate Ditch Lining for Ditch J -11 <br />Approved <br />09/22/2014 <br />TR -93 <br />Gob Pile #3 East Drying Area <br />Under <br />Review <br />PR -14 <br />Spruce Stomp Lease <br />Under <br />Review <br />CW <br />Section III - Status of Stipulations <br />The stipulation history for the Bowie No. 2 Mine was reviewed as part of the midterm review. <br />The review included an investigation of any stipulations imposed since the last permit renewal, <br />and any responses to existing stipulations received since the last permit renewal. Any <br />stipulations associated with this permit and issued over the life of this operation which are not <br />discussed in this midterm review have been complied with or terminated. The following table <br />lists the stipulations placed on the permit since the last renewal, and the current status of those <br />stipulations. <br />Number <br />Description <br />Originating <br />Permit <br />Action <br />Status <br />29 <br />Prior to placement of cover on the eastern portion of Gob Pile #4, <br />TR -75 <br />CW <br />BRL must survey the eastern portion of the pile to verify that <br />slopes are not steeper than 2:1 and regrade any slopes as <br />necessary to ensure conformity with the approved slope design. <br />Documentation of the corrected slopes must be submitted to and <br />approved by the Division before cover can be placed on the <br />eastern portion of the disposal area. The area to be surveyed and <br />regraded is depicted on the February 8, 2013 review drawing <br />submitted with the Technical Revision No. 75 application. <br />30 <br />The 14,000 cy of cover fill material approved to be moved from <br />TR -83 <br />CW <br />the B Portal storage area must be direct hauled to, and used as <br />permanent cover material for, regraded portions of Gob Pile #4. <br />Page 9 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.