My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-06_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2014-10-06_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:31 PM
Creation date
10/6/2014 1:51:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
10/6/2014
Doc Name
Midterm Review Midterm/Cost Estimate (MT4)
From
DRMS
Permit Index Doc Type
Findings
Email Name
SLB
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine (C- 1996 -083) <br />MT- 4 <br />Revision <br />Type and <br />Sequence <br />Description <br />Status <br />Decision <br />Date <br />MR -136 <br />Straw Logs and Wattles for Sediment Control <br />Approved <br />6/5/2013 <br />MR -137 <br />Reclamation Plan for Plantation Road <br />Approved <br />11/12/2013 <br />MR -138 <br />CDOT and CDPHE Permits for Gob Pile #3 <br />Approved <br />9/5/2013 <br />MR -139 <br />Gob Pile #3 Phased Construction Delineation <br />Approved <br />9/6/2013 <br />MR -140 <br />Cultural Resource Structure Recording <br />Approved <br />9/25/2013 <br />MR -141 <br />Gob Pile #3 Disturbance Boundary Change and Drying Area <br />Approved <br />10/10/2013 <br />MR -142 <br />Gob Pile #3 Air Permit <br />Approved <br />10/28/2013 <br />MR -143 <br />Realign Road to GVB -B15B, -B15C, and —B15D <br />Approved <br />11/5/2013 <br />MR -144 <br />Gob Pile Temporary Drain Pipes <br />Approved <br />11/26/2013 <br />MR -145 <br />Ownership and Control Update <br />Approved <br />12/17/2013 <br />MR -146 <br />Acreage Correction and Pitkin Mesa Pipeline Replacement <br />Approved <br />with <br />Conditions <br />1/27/2014 <br />MR -147 <br />Winter Stockpiling on Gob Pile #3 <br />Approved <br />3/4/2014 <br />MR -148 <br />Main Haul Road Concrete Patch <br />Approved <br />3/13/2014 <br />MR -149 <br />Expand Material Storage Area, Construct Rock Bin <br />Approved <br />3/21/2014 <br />MR -150 <br />West Fork of Terror Creek Flumes <br />Approved <br />5/13/2014 <br />MR -151 <br />D -Bench Disturbed Area Boundary Expansion <br />Approved <br />5/27/2014 <br />MR -152 <br />Relocate Eleven Gob Vent Boreholes <br />Approved <br />6/18/2014 <br />MR -153 <br />Extend culvert C13 on D Bench <br />Approved <br />6/25/2014 <br />MR -154 <br />Trailer Mounted Filter Press <br />Approved <br />7/2/2014 <br />MR -155 <br />Replace Monitoring Well DH -67blw <br />Approved <br />7/8/2014 <br />MR -156 <br />Culvert C -12 Concrete Drop Structure <br />Approved <br />7/24/2014 <br />MR -157 <br />Installation of VWPs at Gob Pile #3 <br />Approved <br />8/21/2014 <br />MR -158 <br />Metal Wingwalls for Culverts <br />Approved <br />8/21/2014 <br />MR -159 <br />Temporary Culvert at Gob Pile #3 <br />Approved <br />9/2/2014 <br />MR -160 <br />Import Coal from Elk Creek Mine <br />Approved <br />9/9/2014 <br />MR -161 <br />Seedbed Preparation and Temporary Culverts <br />Approved <br />9/10/2014 <br />MR -162 <br />Temporary Culverts at Gob Pile #2 <br />Under <br />Review <br />TR -78 <br />Six Gob Vent Boreholes and One Exploration Hole <br />Approved <br />6/6/2013 <br />TR -79 <br />Expand B -Seam Portal Material Storage Area <br />Approved <br />8/9/2013 <br />TR -80 <br />Subdrainage System for Coal Mine Waste Pile #3 <br />Approved <br />9/25/2013 <br />TR -81 <br />Gob Pile #2 Drainage /Topography; Enlarge Pond F <br />Approved <br />10/9/2013 <br />TR -82 <br />Ownership and Control Updates <br />Approved <br />10/18/2013 <br />TR -83 <br />Expand B Bench Material Storage Area <br />Approved <br />11/26/2013 <br />TR -84 <br />Reconfigure Gob Pile #3 Drainage; Expand Pond J <br />Approved <br />with <br />Conditions <br />7/31/2014 <br />Page 8 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.