Shell Frontier Oil & Gas Inc. <br />FINANCIAL WARRANTY CALCULATION FOR AS -BUILT <br />ITEM V . e''. <br />DIMENSIONS <br />METHOD OF DEMOLITION <br />QUANTITY <br />UNIT <br />UNIT COST' SOURCE�p <br />�:CO>' ! +" <br />T <br />"�' NOUPA <br />Separator building - superstructure +gutting_ -- <br />--- <br />401E x 25W x 121 <br />Plant or mill. disposal in licensed landfill _60 mile haul PSNL <br />12,000 CF $0,3901 Ma24t 1e.t3 whrod. 53�711� <br />L- <br />concrete floor /co ntainment slab _ _- <br />...- mentslab-- _ - - <br />- concrete footer / curb waft, step type _ <br />piping - separator building to pipe rack <br />401 z 25W x 6'T _- <br />Concrete floor 6 in. disposal in excavated pR =200 R._push <br />in. - <br />_ <br />-•- <br />--- <br />- <br />- - <br />_ 130' perimeter x 1.OT x 2.0'H <br />Total 25' L x 46' din. insulated steel pipe <br />Concrete footer. 1_ x 2', disposal in_excavated <br />-130 <br />f4,e3 <br />Mo't 41 te.t7wrmoa. <br />5477.5 7 <br />7.07 <br />Steel pipe demo. only, with insulation 5 -10 in. diameter <br />25 <br />-LF <br />LF <br />$6.35 <br />Ma241 13.460200 <br />$125.69 <br />0.19 <br />Propane bottls acrubberr I are KO drum - s ±y - <br />18'L x 14W x 10'H - <br />Punt cr raq disposal in licensed landfill _60 r Le boobNLfl _- - <br />_ _ 2,520- <br />CF <br />So,teot <br />Ma24t te.t3 wmod. <br />5779. <br />0.4b <br />concrete pad !containment slab <br />181- x 14W x 67 - - <br />Concrete floor, 6 in., disposal m excavated prt _200 ft. ush ---_ <br />262 <br />8F <br />St 2433 <br />M-02 4t t3.t7wmoe. <br />5248.47 <br />0.38 <br />_ concrete footer /curb wall, steptype _- _ <br />_64' perimeter x 1.0'T x 2.0'H <br />Concrete footer, 1' x 2__disposei in excavated 200 R- gush <br />- <br />84 <br />LF <br />54 a1 <br />M.o2 4 t te.t7 v imoa. <br />$235.11 <br />0_53 <br />piping propane skid to pipe rack <br />Total 25' L x 4-6' die. insulated steel pipe <br />Steel pipe demo. only, with insulation 5-10 in. diameter <br />25 <br />LF <br />$6.35 <br />U-02 41 13.460=0 <br />_ -- $125.89. <br />0.19 <br />Pump for flare system - superstructure ±gutting_- <br />concrete pad / containment slab ---- _ <br />- concrete footer! curb wall step type L -___ __________- __ -__• <br />piping - pump skid to flare line <br />101 x 8 W x 8'H -- <br />101_ x 8W x 67 <br />Plant or mfll disposal in licensed landfill _60 mile haud1PS1411� -_ <br />640 <br />CF <br />Soaat <br />Ma241 te.13 wrmod. <br />$797.9 <br />0.12 <br />Concrete floor, 6 M disposal in excavated_pd 200 R�wsh_ _ _ <br />- 80 <br />SF <br />$t 243.8 <br />M-0¢ 4t 16.17 vwmoe: <br />576. <br />0.12 <br />38_peflmetar x 1.OT x 2�FI -_ <br />Concrete tooter t�x 2'_ dsal in excavated pR _ 2 R_push <br />Steel pipe demo, only, with insulation, 3144 in. diameter <br />36 <br />20 <br />LF <br />LF <br />--- - <br />54.es <br />$3.06 <br />-- <br />M-024t 18.17 rwmod, <br />Mac 41 13,4110100 <br />------ -- - --- <br />5132.2 <br />$48.53 <br />- -- - - -- <br />0.90 <br />0.13 <br />20'L x 4' die. insulated steel pipe <br />Flare system - piping - pipe rack #1 ro flare stack <br />230'Lx, ' dia. insulated steel pipe <br />Steel p� demo. on w8h msulet onL3 /44 in_diameter -_- - <br />- 230 <br />LF <br />53.oe <br />Mm 41 13_46 0100 <br />$666.11 <br />1_53 <br />ipu!g "r supports - above grade portion ----_ - <br />12 3W x alrg. 5'H slructurai steel or pipe - -•__ <br />Welded steel pier 4 in. diameter <br />-_ 180 <br />LF <br />$7.46- <br />W0241 13.33 3200 <br />St,O&1. <br />3.26 <br />piping T sy2port foundations - caisson type --_-_ - <br />122 a. die. 6 R L <br />Casson footer, 2 0 R diameter, 9 ^12 R. lony_buried in place <br />12 <br />Fw <br />- <br />Sea es <br />cno cooT,CHa, Mors <br />$788. <br />0.66 <br />flare stack superstructure <br />Assume 4' diameter x 50'H with gtly,wires <br />Radio tower, sag stVported, 60'H <br />- - -1 ___ _ <br />EA <br />- 5 ,480 <br />Ma24t 13.78 0700 <br />$1,173 <br />8.80 <br />Ham stack wire foundations <br />4 2 R. dia. X 6 ft. L <br />Caisson footer, 2 0 ft. diameter, 9 -12 R. buried M ace <br />4 <br />EA <br />ses.re <br />CRG,C00T,CH8, Mann <br />5282. <br />0.201 <br />_Pump building - superstructure - -- <br />351 x 20W x 15H <br />Plant or mlfl disposal in licensed landfill _60 mile IuadLPSNLj_ <br />10 Soo <br />$0-601 <br />Ma241 16.13 wrmod. <br />$3,247. <br />1.89 <br />concrete floor -- -_ <br />351. x 20W x 6T <br />Concrete floor, 6 in disposal in excavated pit -2D0 ft. h <br />SF <br />512433 <br />M-02 41 13.17 wmod. <br />concrete tooter, strip type - - _- - <br />110' a irnsk r x 1 -k x 2.0'H <br />Concrete footer,, tx 2', disposal in excavated_pN__ 200 Roush _ <br />110 <br />LF <br />$4 67 <br />Ma211 16.17 wrtnd. <br />$404. <br />0.91 <br />piping - Pump bldg. to pipe rack <br />Total 25' L x 4-6' die. Insulated steel pipe <br />Steel pipe demo. only, with insulation 5-10 in. diameter <br />25 <br />LF <br />a5 <br />Pump for tank battery -� <br />101- x 8W x 8'H - -_ - -_ _ -_- - - -� <br />Plant or m81, disposal in licensed landfill - 60 mile haul PSNL <br />- __ -_ L- 1____ -- <br />640 <br />------ - -._._ <br />cF <br />__ - - <br />$0.3001 <br />Mae 41 16.13 wnrnd. <br />$197.9 <br />0.12 <br />:concretesad (containment slab -_-__ <br />_ - _ _ <br />10 L x 8W x 6T <br />-- _ -_-_2 -- - ...... -_ <br />Concrete Nnr,•_6 k1., d'�sal in excavated pit - 2D011 pttsh -_ <br />80 <br />-- <br />sF <br />-- <br />512,133 <br />- -- <br />M-0241 13.17 whrod. <br />578 <br />0.72 <br />type <br />_: concrete footer /curb wall�stnp -_ _ -_ _ <br />36' per! x 1_07 x 2'H -_ _ <br />Concrete footer, 1�x 2�dis eel in exk�vvafed -200 Rio h _ <br />36 <br />LF <br />-_ <br />_ $4.63__ <br />-_ _ _- _ _ _ <br />_Ma2411GATW nod. <br />_ <br />$132.2 <br />-- -- -- - <br />0.30 <br />piping, um skid to truck loadout <br />Total 20' L x 4.6' die. insulated steel I <br />Steel i demo. with insulation 5-10 in. diameter, <br />20 <br />LF <br />$6.35 <br />M-02 41 13.460200 <br />$100.71 <br />--___ <br />0.15 <br />Tank batterx_verilcaltanks - su erstructure <br />9 steel tanks_ a�12' diameter x 20'H each _ _ <br />_ Small surface tank removal. 15 OQ� - 30000gaL ZEAL-__ -__-_ <br />9 <br />Trrk___ <br />53,425.3750 <br />Mae ea to 3owvnne. <br />$24,446. <br />24.00 <br />tank containme adsiNA steel rings + plast c liners__ <br />9 15' diameter x 2'H_____ -_ _ - <br />Plant M mi0 disposal in licensed landfill - 60 mile haul (PSNLO_______ <br />_ _ 3 161 ___ <br />cF __ <br />_ _$o�ssot - <br />Mac 4118.13 wnm, <br />5983.96 <br />0.67 <br />stairs/catwalk - superstructure - __- __-- __ - - -- <br />--- -- --- -- -- -- <br />2 25'L x 3'W x 5'H _ <br />-- ----___ ------•- - <br />PIeM or mill, disposal m licensed fandflll - 60 Mle haul (PSNL - -_ <br />--- -- -- - ---- -- <br />_ _ 750 _ <br />-_ cF _ <br />_ So 3.801- <br />Ma241 16.13 wand. <br />5232. <br />O.t4 <br />stairwa landings / antrywa slabs <br />.Y - <br />tank battery containment aE d (NA__ temp, at. rim + liner <br />2 51- x 5W x 4T ______- ----- -- ------.--___. <br />Concrete floor, 4 in., dis sal in excavated pit 200 R <br />__.__-.--- -- _---- -- --.--� __---- C "- PUeh <br />Plant or miH,' isposal in licensed landfill - f30 Mk to (PSNL! -__- <br />50 ._. <br />_.-aF <br />Ma2411S17 Wmod. <br />$32.8 <br />- - -0. <br />0.05 <br />100'L x 55W x 2'H - <br />- - - - <br />114___000 ___ <br />N <br />___ CF__. <br />._50.6259 <br />__ X01 <br />Ma241 1e.13wnrnd. <br />_3 402. <br />1.98 <br />- containment curb wall (NA -steel ring +plastic IinerL -- <br />tank surface inlet/outlet piping to_eipe rack _ -_ <br />na <br />ne _ _ <br />na <br />na._ <br />ne <br />na <br />$0.00 <br />2401E x 4 6 "dia. insulated steel pipe <br />Steed demo. only, with insular on 5 10 In. diameter <br />- _- ._- _-- ___ -_ -_-. <br />240 <br />- _- ._..__...__-_- <br />_ LF_ <br />Ssasoo <br />--- -__. -_ <br />Ma241 13.480200 <br />51 208. <br />..1_ <br />tank vent stsck_pi isng -__ _ _- __- __ -__ -- <br />125E x 46'dia. insulated steel Dipe - - - -__- <br />Steelpi� demo only_ with {nsulat on_5v10 in_ diameter ---_ _ <br />125 -_ <br />LF <br />56.3600 <br />024113.460200 <br />5829.44 <br />0.93 <br />tank vent stack guy wire foundations <br />3 it 2 ft. die. X 6 ft. L <br />Caisson footer, 2 0 R. diameter, 9 - 12 ft. long, burled In place <br />3 <br />EA <br />___ <br />565.09 <br />-M- <br />CRO CDOT,CHe, Mow <br />$197.08 <br />0.15 <br />Pump for truck loadout _ - --_ <br />concrete pad / containment slab <br />concrete tooter /curb wall, stri a <br />- - - - - -- P 111? - -- - - - - -- <br />piping. um skid to truck loadout <br />101L x 8W x B'H _- <br />10 L x 8W x 6r -�- -- <br />Plant or 5019 _disposal in licensed Iandfifl�fi0 mile haul (PSNL) <br />Concrete floor, 6 in., disposal in excav_alad pit _200 R. gush <br />Concrete footer_ 1' x 2', cis _sal in exrzveted_pH _200 R_gush- <br />--- - - p° <br />640 <br />CF- <br />$0.3101 <br />Ma2 4116.13 WMwd. <br />$197.9 <br />0.12 <br />80 <br />sF <br />512463 <br />Mae 41 16.17 wnrotl. <br />578 86 <br />0.72 <br />36' ertmeter x 7_OT x 2'H ----_ <br />-- p- --_ <br />36 <br />LF <br />$4.53 <br />Ma24t 1e.t7 wr 1750. <br />$7322 <br />0.30 <br />Total 20' L x 4.6' die. insulated steel i <br />Steel pipe demo. only, with insulation 5 -10 in. diameter <br />20 <br />-- <br />LF <br />---- - <br />1111. <br />-- --- - - -MW. <br />MM 41 13.48 D200 <br />- __$132.2- <br />5100.7/ <br />--- - -- <br />0.15 <br />Truck loadout - superstructure <br />- concrete driveway floor / containment slab <br />----- - -- ---- -- ---- <br />concrete footer / curb wall strip <br />107"L x 20W x 201H _ <br />1071E x 20W x BT <br />•--- ---- --- -- --- ---- _. - - -- <br />254' perimeter x 1.07 x 2.0'H <br />Comm. bl 19 disposal in l tensed landfill: 60 mile haul <br />42 800 <br />CF <br />$02950 <br />Mae 41 ta.13 wrn0d. <br />-58 72._ <br />- 7.71 <br />Concrete Root 8117. dtsposat in excavated pit - 200 k.UA1 - __ - <br />---- ---- - ----- -- <br />Concrete footer, 1' x 2, disposal in excavated ' - 200 ft. <br />_- 2 140 <br />254 <br />9F- <br />LF <br />S22eos <br />----._ <br />54.83 <br />_Ma2 41 ta.t7vwmod <br />Mae 41 118.ti wmnd. <br />-- 53,838._ <br />5933. <br />_ _ - _ 6.87 <br />2.09 <br />Site perimeter fences and gates - elk fence por6on _-- <br />_IA. high wood + wire mesh fence <br />Fence removal_ chain link__posta d fa! _6 -10 ft. high - <br />2686 <br />LF <br />S2.9300 <br />Mae n 13.eo 1700 <br />$8347, <br />18,10 <br />3 -strand barbed wire fence portion --- <br />4 ft, h h13- strand barbed wire fence ---- <br />Fence removal, barbed wire43 strand__ ---- <br />1,209 <br />-LF <br />314000 <br />Mac 41 13.50 1650 <br />51,303. <br />7.50 <br />entrance gate - 8 R. H x 26 ft. W chain link <br />2gete halves, each 8 ft. H x 14 R. L <br />Cate- removal_ chain 6nl , eachgate 14 t wide <br />_ 2 <br />EA <br />$111=0 <br />M41241 13.92 0300 <br />$140.36 <br />0.36 <br />fencing along entrance road - 3 -strand barbed wire <br />4 ft, high, 3 -strand barbed wire fence <br />Fence removal, barbed wire, 3 strand <br />_ <br />248 <br />LF <br />$13000 <br />Ma241 13.801600 <br />$265.31 <br />- 1.53 <br />Lease bounds fence - 3-strand barbed wire -- <br />-- --- <br />3 -strand barbed wireS wildlife -friendd _per BLM1 <br />---- -- - - -- <br />Fence removal4 barbed wke� 3 strsrd _-__ - <br />- - -- -- - -- <br />_ -10 230 _ <br />LF <br />--- <br />513eoo <br />Ma24t t3.eo leoo <br />571,032.6 <br />ti3.44 <br />Emergency exit ate - 4 ft. H x 12 ft. W chain link orequiv. <br />1 ate 4 R. H x 12 R. L <br />Gate removal chain link each 10 ft. - 72 R wide <br />7 <br />EA <br />---- - <br />5113.0000 <br />-- - -- - -- - <br />Mat 41 13.82 0200 <br />_ - - - <br />$85.82 <br />- <br />0.17 <br />Road culverts #1 - borrow ditch crossing -pad 138 turnoff <br />_ 15 ft. die. CMP x 631E - <br />Buried p pe remova4l CMP type -18 in. diameter <br />- ......- <br />63 <br />LF <br />$4.111130 <br />Ma241 13.40w W. <br />$242, <br />0.84 <br />culvert #2 - borrow ditch crossing - paAciny area tumoH - <br />--- - - - - - -- <br />culvert #3 - borrow ditch crossing - walkwa to parking <br />1 5 R. dia. CMP x 6T L <br />-L . CL- - - -- - -- - --- - <br />15 ft. die. CMP x 25'L - - - - -- <br />Buried ippe removal CMP t�e�18 in_ diameter <br />-- -- - - ---- <br />87 <br />°-- -- _ <br />-LF _ <br />$1a03o <br />_ -._ <br />_Ma24t t3�4o wmod` <br />lSe, <br />- -- -- <br />. - <br />0,58 <br />-- - - - <br />Buried : removal CMP 18 in. diameter <br />-- <br />26 <br />LF <br />54.8830 <br />Mat 4t 13.40 wnrod. <br />$98A1 <br />028 <br />culvert #4 - drainage crossing - unnamed drainage <br />_Aft. die. CMP x 38' L <br />•-- ------- .-- .-- .--- -- - ----. <br />Buried ppi a removal, CMP type - W in. diameter <br />_---- <br />38 <br />- <br />LF <br />522.6546 <br />Mat 41 13.40 wand. <br />`-- <br />$682.8 <br />- - <br />1.19 <br />_culvert #5 - drainage crossing -- unnamed dram - _ _ <br />5 ft. die. CMP x 55' L _ - _ _ <br />- Buried Me removal CMP typee_60 in�diarne ter _ _ _ _ _---- <br />-_ <br />_- -56 <br />LF <br />522 e6ro <br />13,40 wmad_ <br />$988,08 <br />1.73 <br />culvert #8 - drainage -foot #1 <br />1 ft. die. CMP x 25' L - •__ - -- - - <br />Btxierll pipe removal, CMP type -12 in. diameter <br />26 <br />LF <br />- <br />$2.7477 <br />_M.o241 <br />Mm 4t 13.40 wmod. <br />$54.4 <br />0_14 <br />ditch <br />culvert #7 - diversion _ditch cross] l0 flare/la own area <br />to <br />2 ft. d a. CMP x_3_0' L ______ _-_- <br />- <br />Buried 1pe removal, CMP type - 24 in. diameter -� - <br />- 30 <br />LF <br />311.5030 <br />Mae 41 13A0 wand. <br />$273.86 <br />culvert #8 - drainage crossing - foot b #2 <br />5 ft die. CMP x 28'L <br />Buried rerrroval CMP 60 in, diameter <br />28 <br />LF <br />$22.66411 <br />Mat 4113.40 Wmod. <br />$503.0 <br />0.88 <br />P- 2010 -026 post -mod4 bondcalc 01b revised Page 4 of 15 <br />