Laserfiche WebLink
amen <br /> performed using one or two extrusion guns. All seams were fusion welded per project technical <br /> specifications. All work performed was observed by AMEC Quality Assurance (QA)personne',. <br /> Approximately 720 lineal feet of anchor trench was backfilled over primary liner. <br /> Destructive samples PDF-32 through PDF-46 were marked for testing. PDF-30, PDF-31, PDF- <br /> 34, and PDF-35 were tested and passed per project technical specifications. <br /> Secondary 100-mil SSMS LLDPE Liner Installation <br /> Quality control was completed for the secondary geomembrane. All secondary liner was <br /> approved for low volume placement. <br /> C) Overliner: <br /> PSSA <br /> Cat 740 trucks hauled LVSCF to the PSSA. Haul roads for the trucks were maintained at least 4 <br /> feet above secondary geomembrane. <br /> Ames continued placing LVSCF on approved secondary liner in minimum 3-foot lifts with Cat <br /> GPS D6 and D8 wide pad dozers between panels S-143 to S-145: S-165 to S-167; S-169 to S- <br /> 174; S-186 to S190; S-196 to S-198; S-215 to S-219; S-240 to S-241; S-244 to S-247; S-276 to <br /> S301; S-315 to S-321; and S-350 to S-352. <br /> See the attached LVSCF map for all placement locations. <br /> II) Storm Water Management <br /> Best Management Practices(BMPs) are being performed. <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope grad ng <br /> and fill placement, underground working remediation and confirmatory drilling; nuclear moisture and <br /> density testing;depth verification testing, geomembrane deployment, testing, and repair monitoring <br /> and certification; SLF inspection and certification; and LVSCF acceptance for primary liner <br /> deployment. LVSCF sampling, and Highway 67 slope grading, topsoil placement, and asphalt <br /> patching work. <br /> II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testi-ig <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> - Low Volume Solution Collection Fill samples LVSCF 87 (control sample) <br /> Low Volume Solution Collection Fill samples LVSCF 15-R through 25-R (Record samples) <br /> General Protect Items <br /> Meetings and Discussions: <br /> Weekly Contractor Meeting September 3, 2014 (CC&V, AMEC, Ames) <br /> ECA daily safety meetings <br /> Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CCBV: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects, AMEC, and Ames. <br /> 2014 09 06-MLE2 WEEKLY FINAL Page 3 of <br />