Laserfiche WebLink
ameO <br /> Miscellaneous: <br /> Low volume solution collection fill processing continued. <br /> r Slope grading and topsoil placement occurred adjacent to HWY 67 between the MSE wall and <br /> the PSSA. <br /> Forms were removed from the HWY 67 concrete ditch adjacent to the MSE wall and the surface <br /> drain in the overlook parking area. <br /> Asphalt patching adjacent to the concrete ditch and MSE wall on HWY 67 occurred. <br /> Deliveries: <br /> 48 rolls of 80-mil LLDPE geomembrane DSMS liner was delivered to ECA. <br /> Ames received HVSCS piping and staged it at the laydown yard west of the crusher. <br /> Submitted by: Eric Lorenson Date. September 11, 2014 <br /> Reviewed Date: September 11, 2014 <br /> Tim Burkhard - — <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Approved By: _-i/ Date: 4,? <br /> Approved By: �` � /� Date: <br /> 20140906-MLE2 WEEKLY FINAL Page 4 of 7 <br />