My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-28_GENERAL DOCUMENTS - C2010088
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010088
>
2014-08-28_GENERAL DOCUMENTS - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:08 PM
Creation date
9/3/2014 8:14:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
General Documents
Doc Date
8/28/2014
Doc Name
Midterm (MT1)
From
DRMS
To
Jim Stover
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet C <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Volume: <br />ont'd Task # 001 <br />8.00 LCY <br />10.00 LCY <br />9.00 LCY <br />9.41 LCY <br />Final Truck Volume Based on Number of Loader Passes <br />Loading Tool Capacity <br />Rated Capacity: <br />Bucket Fill Factor: _ <br />Adjusted Capacity: <br />Job Condition Corrections: <br />2.260 <br />0.875 <br />Page 2 of 3 <br />7.91 LCY <br />Bucket Size Class: Medium <br />LCY (heaped) <br />Loose material - 112" to 314" (85 - <br />LCY <br />0.875 <br />Site Altitude (ft.): 4500 feet <br />Net Correction: 0.830 0.830 <br />Loadine Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 4 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: BELOW AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA <br />Passes <br />minutes <br />C 6e Time Factors <br />Truck <br />Loader <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />(CAT HB) <br />CAT HB <br />Job Efficiency: <br />0.830 <br />0.830 <br />Net Correction: 0.830 0.830 <br />Loadine Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 4 <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: BELOW AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): NA <br />Passes <br />minutes <br />C 6e Time Factors <br />NA <br />Factor (min.) <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB <br />Stockpile: <br />NA <br />NA <br />(Cat HB) <br />Truck Ownership: <br />NA <br />NA <br />(Cat HB) <br />Operation: <br />NA <br />NA <br />(Cat 1113 <br />Dump Target: <br />I NA <br />NA <br />(Cat HB) <br />Net Cycle Time Adjustment: <br />NA <br />minutes <br />Adjusted Loader Cycle Time: <br />0.367 <br />minutes <br />Net Load Time per Truck: <br />1.201 <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.500 Minutes <br />Truck Load Time: 1.201 Minutes Adjusted for site altitude: 1.201 Minutes <br />Truck Maneuver and Dump Time: 0.80 Minutes Adjusted for site altitude: 0.800 Minutes <br />Truck Travel (Haul & Return, )'Time:, Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />Cll{CES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.