My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-28_GENERAL DOCUMENTS - C2010088
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010088
>
2014-08-28_GENERAL DOCUMENTS - C2010088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:47:08 PM
Creation date
9/3/2014 8:14:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010088
IBM Index Class Name
General Documents
Doc Date
8/28/2014
Doc Name
Midterm (MT1)
From
DRMS
To
Jim Stover
Permit Index Doc Type
Findings
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task # 001 Page 3 of <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Travel <br />(Ft) <br />( %) <br />( °!o) <br />(fpm) <br />Time <br />( %} <br />(fpm) <br />Time <br />min <br />1 <br />3600.00 <br />0.00 <br />3.00 <br />3.00 <br />2824 <br />1.379 <br />Haul Time: <br />Return Route: <br />1.379 <br />minutes <br />CIRCES Cost Estimating Software <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />Loading Tool unit <br />(Ft) <br />Production <br />( %) <br />( %} <br />(fpm) <br />Time <br />9I.96 <br />LCY /Hour Adjusted for job efficiency: <br />76.33 LCY/Hour <br />Optimal No. of Trucks: <br />min <br />Truck(s) Selected Number of Trucks: <br />1 3600.00 0.00 3.00 3.00 2874 <br />1.281 <br />CIRCES Cost Estimating Software <br />Return Time: 1.281 <br />minutes <br />Total Truck Cycle Time: 5.161 <br />minutes <br />Loading Tool unit <br />Production <br />279.01 <br />LCY /Hour Adjusted forjob efficiency: <br />231.58 LCY/Hour <br />Truck Unit Production <br />9I.96 <br />LCY /Hour Adjusted for job efficiency: <br />76.33 LCY/Hour <br />Optimal No. of Trucks: <br />3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 228.48 <br />LCY /Hour <br />Adjusted single truck/loader team production: 228.48 <br />LCY /Hour <br />Adjusted multiple truck/loader team production: 228.98 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: <br />I <br />_ Team(s) Total joh time: 20.35 <br />Hours <br />Unit cost: <br />$3.399 <br />fLCY Total job cost: $15,840 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.