Laserfiche WebLink
Page I of 3 <br />TP,UCK/LOADER TEAM WORK <br />Task description: Remove Fill from Haul Road #1 and Place on Facilities .area <br />Site: Fruita Loadout Permit Action: MTI Permitllob #: C2010088 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation None <br />Date: 8/26/2014 County: Mesa Filename: 0088 -001 <br />User: ZTT <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />DRMS <br />Equipment Descri tion <br />Truck Loader Team - Truck: Generic 8 -10 c . 6x4 <br />- Loader: Cat 336D L 10' -6" Stick <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />C'nst Breakdown: Tnirk/l.nader Team <br />Shift basis: I per day <br />NA <br />Cat D9T - 9SU <br />CAT 12M <br />Water Tanker, 5;000 Gal. <br />iunnort F.nuinment <br />Maintenance Fminment <br />Total work team cost/hour; $778.32 <br />MATERIAL OUANTITIES <br />Initial volume: 4.000 <br />Loose volume: 4,660 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />CCY Swell factor: 1.165 <br />LCY <br />Division of Reclamation, Mining & Safety; Map IS <br />Cat Handbook <br />$0.00 <br />$o.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds /LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 9.41 LCY <br />CIRCES Cost Fstintating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />Ownership cost/hour: <br />100 <br />$939 <br />100 <br />NA <br />100 <br />50 <br />100 <br />$38.17 <br />NA <br />$72.57 <br />$24.98 <br />$20 -53 <br />Operating cos#/hour: <br />$50.50 <br />587.89 <br />NA <br />$142.41 <br />$23.17 <br />$47.40 <br />Ripper op. cost/hour: <br />NA <br />$0,00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$0.00 <br />$38.83 <br />NA <br />$38.85 <br />$38.23 <br />$25.61 <br />Unit Subtotals: <br />$59.89 <br />$164.89 <br />NA <br />$253.83 <br />$86.38 <br />$93.55 <br />Number of Units: <br />3 <br />1 <br />0 <br />l <br />1 <br />1 <br />Group Subtotals: <br />Work: $344.56 <br />Support: $253.83 <br />Maint: $179.93 <br />Total work team cost/hour; $778.32 <br />MATERIAL OUANTITIES <br />Initial volume: 4.000 <br />Loose volume: 4,660 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />Material Purchase Cost: <br />Total Cost: <br />CCY Swell factor: 1.165 <br />LCY <br />Division of Reclamation, Mining & Safety; Map IS <br />Cat Handbook <br />$0.00 <br />$o.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds /LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 9.41 LCY <br />CIRCES Cost Fstintating Software <br />