My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Northern Colorado Constructors, Inc. <br />J &T Consulting, Inc. <br />1 NCCI Pit #1 <br />8/21/2014 <br />on Bond Quantities and Costs <br />Phase 1 (11.07 acres) <br />Reclamation Operation <br />Quantity <br />Unit <br />Unit Cost <br />Cost <br />Active Mining Area <br />20% Cost Permanent liner <br />580 <br />If <br />$11.87 <br />$6,885 <br />20% Cost Liner Required to Close Phase 1 <br />2,490 <br />If <br />$11.87 <br />$29,556 <br />Topsoil Area Above Water <br />1.4 <br />ac <br />$2,178 <br />$3,049 <br />Revegetate Area Above Water <br />1.4 <br />ac <br />$820 <br />$1,148 <br />Dewatering of Full Pit <br />79.4 <br />Mil. Gal. <br />$201.50 <br />$15,999 <br />Plant Site/Temporary Topsoil Stockpile Areas in Phases 5 <br />71.2 <br />Mil. Gal. <br />$201.50 <br />$14,347 <br />Scarifying Ground in Plant Site Area <br />4.6 <br />ac <br />$200 <br />$920 <br />Topsoil Placement in Plant Site Area <br />4.6 <br />ac <br />$2,178 <br />$10,019 <br />Revegetate Plant Site Area <br />4.6 <br />ac <br />$820 <br />$3,772 <br />Scarifying Ground in Topsoil Stockpile Areas <br />2.0 <br />ac <br />$200 <br />$400 <br />Revegetate Topsoil Stockpile Areas <br />2.0 <br />ac <br />$820 <br />$1,640 <br />Batch Plant Areas <br />Scarifying Ground in Batch Plant Area <br />10.0 <br />ac <br />$200 <br />$2,000 <br />Topsoil Placement in Batch Plant Area <br />10.0 <br />ac <br />$2,178 <br />$21,780 <br />Revegetate Batch Plant Area <br />10.0 <br />ac <br />$820 <br />$8,200 <br />Mobilization <br />1.00 <br />Is <br />$2,500 <br />$2,500 <br />Total Direct Cost <br />$107,868 <br />Overhead and Profit Cost (12.60 %) $13,591 <br />Contract Cost $121,459 <br />Project Management (9.25 %) $11,235 <br />Total Required Financial Warranty For Phase 1 $132,694 <br />Phase 2 (9.93 acres) <br />Reclamation Operation <br />Quantity <br />Unit <br />Unit Cost <br />Cost <br />Active Mining Area <br />20% Cost Liner Required to Close Phase 1 (Credit) <br />885 <br />If <br />$11.87 <br />($10,505) <br />20% Cost Permanent liner <br />570 <br />If <br />$11.87 <br />$6,766 <br />20% Cost Liner Required to Close Phases 1 -2 <br />1,380 <br />If <br />$11.87 <br />$16,381 <br />Topsoil Area Above Water <br />0.9 <br />ac <br />$2,178 <br />$1,960 <br />Revegetate Area Above Water <br />0.9 <br />ac <br />$820 <br />$738 <br />Dewatering of Full Pit <br />71.2 <br />Mil. Gal. <br />$201.50 <br />$14,347 <br />Mobilization <br />1.00 <br />Is <br />$2,500 <br />$2,500 <br />Total Direct Cost <br />$32,187 <br />Overhead and Profit Cost (12.60 %) $4,056 <br />Contract Cost 36,242 <br />Project Management (9.25 %) $3,352 <br />Additional Financial Warranty Required For Phase 2 $39,594 <br />2 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.