Laserfiche WebLink
J <br />i & Northern Colorado Constructors, Inc. NCCI PR #1 <br />T Consulting, Inc. <br />8/21/2014 <br />amation Bond Quantities and Costs <br />Summary of Unit Costs from Technical Revision #2 <br />Direct costs <br />Re- applying topsoil 12" thick <br />Revegetating disturbed area <br />Dewatering full pit <br />Liner Cost (see breakdown below) <br />Mobilization <br />$2,178.00 <br />/ acre <br />$820.00 <br />/ acre <br />$201.50 <br />/ million gallons <br />$59.36 <br />/ linear foot <br />$2,500 <br />lump sum <br />Liner Cost Breakdown <br />Ripping Clay and Shale <br />$7.12 <br />/ linear foot <br />Hauling and placement of clay <br />$16.46 <br />/ linear foot <br />Hauling and placement of overburden <br />$5.94 <br />/ linear foot <br />Blending and moisture conditioning <br />$11.80 <br />/ linear foot <br />Compaction to desired density <br />$17.43 <br />/ linear foot <br />QA/QC <br />$0.61 <br />/ linear foot <br />Total Liner Cost <br />$59.36 <br />/ linear foot <br />20% Total Liner Cost (Regulated Construction Option) <br />$11.87 <br />/ linear foot <br />Overhead and Profit Costs <br />Liability insurance 1.55% of direct cost <br />Performance bond 1.05% of direct cost <br />Profit 10.00% of direct cost <br />Total Overhead Cost 12.60% of direct cost <br />Project Management <br />Engineering and bidding 4.25% of direct cost <br />Management and administration 5.00% of direct cost <br />Total Additional Cost 9625% of direct cost <br />Additional Unit Costs <br />Direct costs <br />Scarifying Ground $200 / acre <br />1 of 8 <br />