My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />i & Northern Colorado Constructors, Inc. NCCI PR #1 <br />T Consulting, Inc. <br />8/21/2014 <br />amation Bond Quantities and Costs <br />Summary of Unit Costs from Technical Revision #2 <br />Direct costs <br />Re- applying topsoil 12" thick <br />Revegetating disturbed area <br />Dewatering full pit <br />Liner Cost (see breakdown below) <br />Mobilization <br />$2,178.00 <br />/ acre <br />$820.00 <br />/ acre <br />$201.50 <br />/ million gallons <br />$59.36 <br />/ linear foot <br />$2,500 <br />lump sum <br />Liner Cost Breakdown <br />Ripping Clay and Shale <br />$7.12 <br />/ linear foot <br />Hauling and placement of clay <br />$16.46 <br />/ linear foot <br />Hauling and placement of overburden <br />$5.94 <br />/ linear foot <br />Blending and moisture conditioning <br />$11.80 <br />/ linear foot <br />Compaction to desired density <br />$17.43 <br />/ linear foot <br />QA/QC <br />$0.61 <br />/ linear foot <br />Total Liner Cost <br />$59.36 <br />/ linear foot <br />20% Total Liner Cost (Regulated Construction Option) <br />$11.87 <br />/ linear foot <br />Overhead and Profit Costs <br />Liability insurance 1.55% of direct cost <br />Performance bond 1.05% of direct cost <br />Profit 10.00% of direct cost <br />Total Overhead Cost 12.60% of direct cost <br />Project Management <br />Engineering and bidding 4.25% of direct cost <br />Management and administration 5.00% of direct cost <br />Total Additional Cost 9625% of direct cost <br />Additional Unit Costs <br />Direct costs <br />Scarifying Ground $200 / acre <br />1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.