Laserfiche WebLink
SECTION 31 10 00 <br />SITE CLEARING <br />PART 1 GENERAL <br />1.1 SUMMARY <br />A. Section Includes: <br />1. Removing surface debris. <br />2. Removing designated trees, shrubs, and other plant life. <br />3. Removing abandoned utilities. <br />4. Excavating topsoil. <br />1.2 SUBMITTALS — Not used <br />1.3 QUALITY ASSURANCE <br />A. Conform to applicable codes for disposal of debris. <br />PART 2 PRODUCTS - Not used. <br />2.1 MATERIALS — Not used <br />PART 3 EXECUTION <br />3.1 EXAMINATION <br />A. Section 01 30 00 -Administrative Requirements. <br />B. Verify existing plant life designated to remain is tagged or identified. <br />C. Identify waste area for placing removed materials. <br />3.2 PREPARATION <br />A. Call Local Utility Line Information service not less than three working days before <br />performing Work. <br />1. Request underground utilities to be located and marked within and surrounding <br />construction areas. <br />3.3 PROTECTION <br />A. Locate, identify, and protect utilities indicated to remain, from damage. <br />B. Protect trees, plant growth, and features designated to remain, as final landscaping. <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Site Clearing <br />31 1000-1 <br />