Laserfiche WebLink
C. Protect bench marks, survey control points, and existing structures from damage or <br />displacement. <br />3.4 CLEARING <br />A. Clear areas required for access to site and execution of Work to minimum depth of 12 <br />inches. <br />B. Remove trees, including entire root ball, and shrubs in Work area. <br />C. Clear undergrowth and deadwood, without disturbing subsoil. <br />3.5 REMOVAL <br />A. Remove debris, rock, and extracted plant life from site. <br />B. Remove abandoned utilities. Indicate removal termination point for underground utilities <br />on Record Documents. <br />C. Continuously clean-up and remove waste materials from site. Do not allow materials to <br />accumulate on site. <br />D. Do not burn or bury materials on site. Leave site in clean condition. <br />3.6 TOPSOIL EXCAVATION <br />A. Excavate topsoil from Work area without mixing with foreign materials for use in finish <br />grading. <br />B. Stockpile in area designated on site and protect from erosion. <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Site Clearing <br />31 1000 -2 <br />