Laserfiche WebLink
3.2 STOCKPILING <br />A. Stockpile materials on site if necessary. <br />B. Stockpile in sufficient quantities to meet Project schedule and requirements. <br />C. Stockpile differing materials apart to prevent mixing. <br />D. Prevent intermixing of soil types or contamination. <br />E. Direct surface water away from stockpile site to prevent erosion or deterioration of <br />materials. <br />3.3 STOCKPILE CLEANUP <br />A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent <br />free standing surface water. <br />B. When borrow area is indicated, leave area in clean and neat condition. Grade site surface <br />to prevent free standing surface water. <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Soils For Earthwork <br />310513 -3 <br />