Laserfiche WebLink
3. Addenda. <br />4. Modifications to the Design Documents. <br />5. Reviewed Shop Drawings, Product Data, and Samples. <br />6. Manufacturer's instruction for assembly, installation, and adjusting. <br />B. Ensure entries are complete and accurate, enabling future reference by Owner. <br />C. Store record documents separate from documents used for construction. <br />D. Record information concurrent with construction progress, not less than weekly, <br />including survey of excavated surfaces and liner embankment placement. <br />E. Specifications: Legibly mark and record at each product section description of actual <br />products installed, including the following: <br />1. Manufacturer's name and product model and number. <br />2. Product substitutions or alternates utilized. <br />3. Changes made by Addenda and modifications. <br />F. Record Drawings: Legibly mark each item to record actual construction including: <br />1. Surveyed elevations of excavations and limits/locations of fill for each fill type. <br />2. Surveyed horizontal locations of each fill type. <br />3. Surveyed locations /elevations of and geologic anomalies encountered during <br />construction.. <br />4. Field changes of dimension and detail. <br />5. Details not on original Design drawings. <br />G. Submit documents to Engineer. <br />PART 2 PRODUCTS - Not Used <br />PART 3 EXECUTION - Not Used <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Execution And Closeout Requirements <br />017000-2 <br />