My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Addenda. <br />4. Modifications to the Design Documents. <br />5. Reviewed Shop Drawings, Product Data, and Samples. <br />6. Manufacturer's instruction for assembly, installation, and adjusting. <br />B. Ensure entries are complete and accurate, enabling future reference by Owner. <br />C. Store record documents separate from documents used for construction. <br />D. Record information concurrent with construction progress, not less than weekly, <br />including survey of excavated surfaces and liner embankment placement. <br />E. Specifications: Legibly mark and record at each product section description of actual <br />products installed, including the following: <br />1. Manufacturer's name and product model and number. <br />2. Product substitutions or alternates utilized. <br />3. Changes made by Addenda and modifications. <br />F. Record Drawings: Legibly mark each item to record actual construction including: <br />1. Surveyed elevations of excavations and limits/locations of fill for each fill type. <br />2. Surveyed horizontal locations of each fill type. <br />3. Surveyed locations /elevations of and geologic anomalies encountered during <br />construction.. <br />4. Field changes of dimension and detail. <br />5. Details not on original Design drawings. <br />G. Submit documents to Engineer. <br />PART 2 PRODUCTS - Not Used <br />PART 3 EXECUTION - Not Used <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Execution And Closeout Requirements <br />017000-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.