Laserfiche WebLink
SECTION 0170 00 <br />EXECUTION AND CLOSEOUT REQUIREMENTS <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />1.2 <br />1.3 <br />1.4 <br />1.5 <br />A. Closeout procedures. <br />B. Final cleaning. <br />C. Protecting installed construction. <br />D. Project record documents. <br />CLOSEOUT PROCEDURES <br />A. Submit written certification that Design Documents have been reviewed, Work has been <br />inspected, and that Work is complete in accordance with Design Documents and ready <br />for Engineer's review. <br />B. Provide submittals to Engineer required by Owner. <br />FINAL CLEANING <br />A. Execute final cleaning prior to final project assessment. <br />B. Clean site; sweep paved areas, rake clean landscaped surfaces. <br />C. Remove waste and surplus materials, rubbish, and construction facilities from site. <br />PROTECTING INSTALLED CONSTRUCTION <br />A. Protect installed Work and provide special protection where specified in individual <br />specification sections. <br />B. Provide temporary and removable protection for installed products. Control activity in <br />immediate work area to prevent damage. <br />C. Prohibit traffic from landscaped areas. <br />PROJECT RECORD DOCUMENTS <br />A. Maintain on site one set of the following record documents; record actual revisions to the <br />Work: <br />1. Drawings. <br />2. Specifications. <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Execution And Closeout Requirements <br />017000-1 <br />