Laserfiche WebLink
F. Provide equipment and personnel to store products by methods to prevent soiling, <br />disfigurement, or damage. <br />G. Arrange storage of products to permit access for inspection. Periodically inspect to verify <br />products are undamaged and are maintained in acceptable condition. <br />1.5 PRODUCT OPTIONS <br />A. Products Specified by Reference Standards or by Description Only: Any product meeting <br />those standards or description. <br />B. Products Specified by Naming One or More Manufacturers: Products of one of <br />manufacturers named and meeting specifications, no options or substitutions allowed. <br />1.6 PRODUCT SUBSTITUTION PROCEDURES <br />A. Engineer will consider requests for Substitutions only within 14 days after date <br />notification to Owner that work has been scheduled to begin. <br />B. Substitutions may be considered when a product becomes unavailable through no fault of <br />Contractor. <br />C. Document each request with complete data substantiating compliance of proposed <br />Substitution with Contract Documents. <br />D. A request constitutes a representation that Contractor: <br />1. Has investigated proposed product and determined that it meets or exceeds <br />quality level of specified product. <br />2. Will provide same warranty for Substitution as for specified product. <br />3. Will coordinate installation and make changes to other Work which may be <br />required for the Work to be complete with no additional cost to Owner. <br />E. Substitutions will not be considered when they are indicated or implied on Shop Drawing <br />or Product Data submittals, without separate written request, or when acceptance will <br />require revision to Contract Documents. <br />F. Substitution Submittal Procedure: <br />1. Submit two copies of request for Substitution for consideration. Limit each <br />request to one proposed Substitution. <br />2. Submit Shop Drawings, Product Data, and certified test results attesting to <br />proposed product equivalence. Burden of proof is on proposer. <br />3. Engineer will notify Contractor in writing of decision to accept or reject request. <br />PART 2 PRODUCTS — Not Used <br />PART 3 EXECUTION - Not Used <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Product Requirements <br />016000-2 <br />