Laserfiche WebLink
SECTION O1 33 00 <br />SUBMITTAL PROCEDURES <br />PART 1 GENERAL <br />1.1 SECTION INCLUDES <br />A. Submittal procedures. <br />B. Construction progress schedules. <br />C. Proposed products list. <br />D. Product data. <br />E. Shop drawings. <br />F. Test reports. <br />G. Certificates. <br />H. Manufacturer's instructions. <br />I. Construction photographs. <br />1.2 SUBMITTAL PROCEDURES <br />A. Transmit each submittal with Engineer accepted form. <br />B. Sequentially number transmittal forms. Mark revised submittals with original number and <br />sequential alphabetic suffix. <br />C. Identify Project, Contractor, subcontractor and supplier; pertinent drawing and detail <br />number, and specification section number, appropriate to submittal. <br />D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification <br />of products required, field dimensions, adjacent construction Work, and coordination of <br />information is in accordance with requirements of the Work. <br />E. Schedule submittals to expedite Project, and deliver to Engineer. Coordinate submission <br />of related items. <br />F. For each submittal for review, allow 14 days excluding delivery time to and from <br />Contractor. <br />G. Allow space on submittals for Contractor and Engineer review stamps. <br />H. When revised for resubmission, identify changes made since previous submission. <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Submittal Procedures <br />01 33 00 - 1 <br />