J. Replace dislocated survey control points based on original survey control. Make no <br />changes without prior written notice to Architect/Engineer. <br />1.4 PRECONSTRUCTION MEETING <br />A. Engineer will schedule meeting after notice has been given to Owner that construction <br />will begin. <br />B. Attendance Required: Owner, Owner's Representative, Engineer, Geotechnical Engineer, <br />Surveyor, and Contractor. <br />C. Agenda: <br />1. Distribution of Contract Documents. <br />2. Submission of list of Subcontractors, list of products, and progress schedule. <br />3. Designation of personnel representing parties in Contract, and Engineer. <br />4. Procedures and processing of field decisions, submittals, substitutions. <br />5. Scheduling. <br />6. Scheduling activities of Geotechnical Engineer. <br />D. Record minutes and distribute copies within seven days after meeting to participants, <br />with two copies to Engineer, Owner, and those affected by decisions made. <br />1.5 PROGRESS MEETINGS <br />A. Engineer will make arrangements for meetings, prepare agenda with copies for <br />participants, preside at meetings. <br />B. Attendance Required: Job superintendent, major subcontractors and suppliers, Owner <br />and /or Owner's Representative, Engineer, as appropriate to agenda topics for each <br />meeting. <br />C. Agenda: <br />1. <br />Review minutes of previous meetings. <br />2. <br />Review of Work progress. <br />3. <br />Field observations, problems, and decisions. <br />4. <br />Identification of problems impeding planned progress. <br />5. <br />Review of submittals schedule and status of submittals. <br />6. <br />Maintenance of progress schedule. <br />7. <br />Corrective measures to regain projected schedules. <br />8. <br />Planned progress during succeeding work period. <br />9. <br />Coordination of projected progress. <br />10. <br />Maintenance of quality and work standards. <br />11. <br />Effect of proposed changes on progress schedule and coordination. <br />12. <br />Other business relating to Work. <br />D. Record minutes and distribute copies within seven days after meeting to participants, <br />with two copies to Engineer, Owner, and those affected by decisions made. <br />END OF SECTION <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Administrative Requirements <br />013000-2 <br />