My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-29_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2014-08-29_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:28:21 PM
Creation date
8/29/2014 4:19:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
8/29/2014
Doc Name
Technical revision request TR08
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR8
Email Name
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly <br />report inability to comply with requirements. <br />Submittals not requested will not be recognized or processed. <br />K. Provide copies of approved submittals to Owner and Owner's Representative. <br />1.3 CONSTRUCTION PROGRESS SCHEDULES <br />A. Submit preliminary outline Schedules within 14 days after date notice is given to Owner <br />that work is scheduled to begin. After review, submit detailed schedules within 7 days <br />modified to accommodate revisions recommended by Owner. <br />B. Distribute copies of reviewed schedules to Project site file, subcontractors, suppliers, and <br />other concerned parties. <br />C. Instruct recipients to promptly report, in writing, problems anticipated by projections <br />indicated in schedules. <br />D. Submit computer generated horizontal bar chart with separate line for each section of <br />Work, identifying first work day of each week. <br />E. Indicate estimated percentage of completion for each item of Work at each submission. <br />F. Submit separate schedule of submittal dates for shop drawings, product data, and <br />samples, and dates reviewed submittals will be required from Engineer. <br />G. Indicate delivery dates for products. <br />H. Revisions To Schedules: <br />1. Indicate progress of each activity to date of submittal, and projected completion <br />date of each activity. <br />2. Identify activities modified since previous submittal. <br />1.4 PROPOSED PRODUCTS LIST <br />A. Within 14 days after date notice is given to Owner that work is scheduled to begin, <br />submit list of major products proposed for use, with name of manufacturer, trade name, <br />and model number of each product. <br />B. For products specified only by reference standards, give manufacturer, trade name, model <br />or catalog designation, and reference standards. <br />1.5 PRODUCT DATA <br />A. Product Data: Submit to Engineer for review for limited purpose of checking for <br />conformance with information given and design concept expressed in Design Documents <br />B. Submit number of copies Contractor requires, plus three copies Engineer will retain. <br />NCCI Pit #1 Reservoir Liner - Technical Specifications Submittal Procedures <br />013300 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.