Laserfiche WebLink
II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Y Drain Cover Fill sample DCF -104 (control sample) <br />➢ Low Volume Solution Collection Fill sample LVSCF 13 -R (record sample) <br />➢ Soil Liner Fill samples SLF -18R and 19 -R (record samples) <br />General Project Items <br />Meetings and Discussions: <br />➢ Weekly Contractor Meeting- August 13, 2014 (CC &V, AMEC, Ames) <br />➢ Highway 67 embankment meeting- August 13, 2014 (CC &V, AMEC) <br />➢ CC &V contractor Heath and Safety meeting August 14, 2014 <br />➢ ECA daily safety meetings <br />Ames daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC &V <br />Projects. AMEC, and Ames. <br />Miscellaneous: <br />➢ Drain cover fill crusher processing continued <br />➢ Riprap processing resumed <br />The ditch east of the MSE wall and adjacent to Highway 67 was graded and lined with topsoil <br />➢ Stripe painting occurred on the Highway 67 alignment and overlook parking area <br />Deliveries: None. <br />Submitted by: Eric Lorenson <br />Date: August 20, 2014 <br />Reviewed by: c„� ,� t �((c.y� bti, Date: August 20, 2014 <br />Andrea Meduna <br />Project Engineer <br />Phone: 719 -689 -2986 <br />CC &V Projects <br />Approved By: <br />Approved By: <br />Date: Q /22 Ji <br />Date: T. 2,1 - /`/ <br />2014.06.16 -MLE2 WEEKLY FINAL Page 5 of 8 <br />