Laserfiche WebLink
ATTACHMENT A <br />AMEC - 2014 CQA Field Staff Schedule MLE2 <br />Name <br />Sun. <br />Mon. <br />Tues. <br />Wed. <br />Thurs. <br />Fri. <br />Sat. <br />Au . 10 <br />Aug.11 <br />Aug.12 <br />Aug. 13 <br />Aug. 14 <br />Au .15 <br />Aug. 16 <br />_ <br />Tim Burkhard <br />PR <br />Steve Rice <br />UG <br />UG <br />UG <br />Ben Melly <br />GL <br />GL <br />GL <br />GL <br />GL <br />GL <br />GL <br />Robert Redd <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />Tyler Browning <br />Eric Lorenson <br />GT <br />GT <br />PR <br />GT <br />PR <br />GT <br />PR <br />GT <br />PR <br />GT <br />PR <br />GT <br />PR <br />Denis Koval <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Razi Molloy <br />LT <br />LT <br />LT <br />LT <br />LT <br />I Chad Schreiner <br />GT <br />GT <br />GT <br />GT <br />GT <br />Al Frias <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />Dylan Budreau <br />GT <br />GT <br />GT <br />Rick Buxton <br />GT <br />Ashley Thibedeau <br />GT <br />GT <br />GT <br />i GT <br />GT <br />GT <br />Andrea Meduna <br />PE <br />PE <br />PE <br />LEGEND: <br />PL = Project Lead <br />PM = Project Manager <br />PCE = Project Certifying Engineer <br />PE = Project Engineer <br />PR = Project Resident <br />LG = Lead Geosynthetics Engineer <br />LS = Lead Soils Technician <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GL = Geosynthetics Lead <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />GS = Geophysics Survey Geologist <br />HY = Highway Design Engineer <br />2014.06.16 -MLE2 WEEKLY FINAL Page 6 of 8 <br />