Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 21 of 155 <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.100 <br />(CAT HB) <br />1.000 <br />(GEN. ) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />1.000 <br />(DOZ -OC) <br />1.225 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.708 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.5939 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />243.97 LCY/hr <br />975.88 LCY/hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $1.452/LCY <br />Total job time: <br />Total job cost: <br />6.52 Hours <br />$9,236 <br />CIRCES Cost Estimating Software <br />