Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT <br />BULLDOZER WORK <br />Task description: Push Gravel and Rock to Bog Cut at Portal No. 5A <br />Site: Williams Fork Mines Permit Action: Permit Renewal 06 <br />PROJECT IDENTIFICATION <br />Task #: 009 State <br />Date: 6/27/2014 County <br />User: JLE <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />Permit/Job #: C1981044 <br />Abbreviation: None <br />Filename: C044 -009 <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - lOSU <br />Horsepower: 574 <br />Blade Type: Semi - Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $131.81 <br />NA <br />Operating Cost/Hour: $184.48 <br />100 <br />Ripper op. Cost/Hour: $0.00 <br />0 <br />Operator Cost/Hour: $38.01 <br />NA <br />Total unit Cost/Hour: $354.30 <br />Total Fleet Cost/Hour: $1,417.19 <br />MATERIAL QUANTITIES <br />Initial Volume: 6,000 <br />Swell factor: 1.060 <br />Loose volume: 6,360 LCY <br />Source of estimated volume: Map 26; July 1993 Inspection Estimate <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />500 feet <br />410.8 L C Y/hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -10% <br />Average site altitude: 5,400 feet <br />Material weight: 3,250 lbs/LCY <br />Weight description: Gravel - Pitrun <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />Page 20 of 155 <br />