My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-07_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2014-08-07_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:33 PM
Creation date
8/7/2014 9:36:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
8/7/2014
Doc Name
Adequacy Review No. 3
From
DRMS
To
Moffat County Mining
Type & Sequence
TR36
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 22 of 155 <br />Task description: <br />Site: Williams Fork Mines <br />BULLDOZER WORK <br />ade Overland Conve3 <br />Permit Action <br />PROJECT IDENTIFICATION <br />Task #: 011 State <br />Date: 6/27/2014 County <br />User: JLE <br />Colorado <br />Moffat <br />Agency or organization name: DRMS <br />HOURLY EOt <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />APMENT COST <br />Cat D10T - lOSU <br />574 <br />Semi - Universal <br />1 -shank ripper <br />1 per day <br />(CRG) <br />Corridor <br />Permit Renewal 06 <br />Permit/Job #: C1981044 <br />Abbreviation: None <br />Filename: C044 -011 <br />Total unit Cost/Hour: $354.30 <br />Total Fleet Cost/Hour: $1,417.19 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$131.81 <br />NA <br />Operating Cost/Hour: <br />$184.48 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $354.30 <br />Total Fleet Cost/Hour: $1,417.19 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />5,000 <br />Swell factor: <br />1.125 <br />Loose volume: <br />5,625 LCY <br />Source of estimated volume: Map 26; July 1993 Inspection Estimate <br />Source of estimated swell Cat Handbook <br />factor <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly 2,748.7 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: 5% <br />Average site altitude: 5,400 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.