Laserfiche WebLink
Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace TopsoiUOverburden <br /> Site: Four X Ranch Gravel Pit Permit Action: Reclamation Permit/Job#: M2014033 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 State: Colorado Abbreviation: None <br /> Date: 8/6/2014 County: Morgan Filename: M033-002 _ <br /> User: ECS <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: I per day <br /> Equipment Description <br /> -Scraper: Cat 627G <br /> -Dozer: Cat D8T-8SU <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: CAT 14M <br /> -Water Truck: NA <br /> _Cost Breakdown: Scraper Work Team Su ort ui ment Maintenance E ui ment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA NA 100 NA <br /> Ownership cost/hour: $69.99 $62.67 NA NA $42.03 NA <br /> Operating cost/hour: $184.31 $108.22 NA NA $69.88 NA <br /> Ripper op.cost/hour: NA $0.00 NA NA $0.00 NA <br /> Operator cost/hour: $33.56 $38.01 NA NA $24.47 NA <br /> Unit Subtotals: $287.87 $208.90 NA NA $136.37 NA <br /> Number of Units: 1 1 0 0 1 0 <br /> Group Subtotals: Work: $496.77 Support: $0.00 Maint: $136.37 <br /> Total work team cost/hour:$633.14 <br /> MATERIAL QUANTITIES <br /> Initial volume: 47,592 CCY Swell factor: 1.000 <br /> Loose volume: 47,592 LCY <br /> Source of estimated volume: Permittee Estimate <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,900 lbs/LCY Struck Volume: 15.70 LCY <br /> Material description: Sand and gravel-Dry Heaped Volume: 22.00 LCY <br /> Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br /> Payload Capacity: 18.21 LCY Adjusted Capacity: 18.21 LCY <br /> CIRCES Cost Estimating Software <br />