My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-07_PERMIT FILE - M2014033
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014033
>
2014-08-07_PERMIT FILE - M2014033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2020 1:56:53 PM
Creation date
8/6/2014 3:23:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014033
IBM Index Class Name
Permit File
Doc Date
8/7/2014
Doc Name
Preliminary Review
From
DRMS
To
Four X Ranch, Inc.
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#002 Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 0.50 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude:4650 feet <br /> Scraper Push Dozer Source <br /> Altitude Ad: 1.000 1.000 (CAT HB <br /> Job Efficiency: 0.830 0.830 (CAT HB <br /> Net Correction: 0.830 0.830 <br /> Travel Time: <br /> Road Condition: Rutted dirt,little maintenance,no water, 1"tire penetration 4.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> (min) <br /> 1 750.00 3.00 4.00 7.00 1568 0.56 <br /> Haul Time: 0.56 minutes <br /> Return Route: <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> _ % % % (nun) <br /> 1 750.00 -3.00 4.00 1.00 2913 0.35 <br /> Return Time: 0.35 minutes <br /> Total Scraper team cycle time: 2.01 minutes <br /> Adjusted for job conditions: 451.10 LCY/Hour <br /> Selected Number of Scrapers: 1 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 451.10 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 451.10 LCY/Hour <br /> Unadjusted unit production/hour: 543.49 LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 105.50 Hours <br /> Unit cost: $1.404 /LCY Total job cost: $66,798 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.