My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-08-06_REVISION - C1981044
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981044
>
2014-08-06_REVISION - C1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:31 PM
Creation date
8/6/2014 9:32:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Revision
Doc Date
8/6/2014
Doc Name
Adequacy Review No. 2
From
DRMS
To
Moffat County Mining, LLC
Type & Sequence
TR36
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jerry Nettleton, MCM <br />Page 7 <br />August 6, 2014 <br />this area (rangeland/wildlife) and discusses the mulching rate and crimping requirement. <br />The proposed revised page leaves out this information and simply indicates the MCM has <br />applied for a Phase 1 and 2 bond release for these parcels and plans to sample the areas <br />for final Phase 3 bond release in the future. Please revise this page to include the <br />reclamation information. <br />a. MCM Response to items 2 through 3: In order to provide all relevant <br />information, MCM will retain the existing Reclamation Plan Map, and add the <br />updated Reclamation Map as Map 29a. As appropriate, text references have been <br />modified to reference both maps. Page 2.05 -31.2 has been revised to include the <br />previously provided information, and the revised page is included with these <br />responses. <br />b. DRMS Response: <br />i. Item #1 is resolved. <br />ii. Item #2 was not addressed. This item remains outstanding and will need <br />to be addressed prior to the approval of TR36 and RN6. <br />W. Item #3 is resolved. <br />Rule 2.05.6 — Mitigation Of the Impacts of Mining Operations <br />1) On revised page 2.05 -38; MCM provides the Theim equation. There are two "R" <br />variables in the equation. The variable for the radius of a point on cone of depression <br />should be a lower case "r ". Please correct this variable and submit a revised page. <br />a. MCM Response: Page 2.05 -38 has been revised to correct the noted typo, and <br />the revised page is included with these responses. <br />b. DRMS Response: This item is resolved. <br />2) The Division's staff hydrologist is currently reviewing the revisions made to Section <br />2.05.6 of the permit, specifically the section titled "Postmining or Interim Discharge — <br />No. 5A and No. 6 Mines ". If additional adequacy items are found, they will be <br />forwarded to MCM as soon as possible. <br />a. DRMS Response: After review by the Division's staff hydrologist, no <br />additional adequacy items were identified for this item. This item is considered <br />resolved. <br />4.05.13 — Surface and Ground Water Monitoring: <br />
The URL can be used to link to this page
Your browser does not support the video tag.