My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-21_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2014-07-21_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:45:56 PM
Creation date
7/30/2014 8:30:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
7/21/2014
Doc Name
Adequacy Review
From
DRMS
To
Blue Mountain Energy, Inc
Type & Sequence
RN6
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task # 010 Page 2 of 3 <br /> <br />Truck Bed (volume) Basis: <br /> <br /> Struck Volume:21.60LCY <br /> Heaped Volume: 31.70 LCY <br /> Average Volume: 26.65 LCY <br />Adjusted Volume: 29.89 LCY <br /> <br /> <br /> <br />Final Truck Volume Based on Number of Loader Passes: 26.25 LCY <br /> <br />Loading Tool Capacity <br /> <br />Bucket Size Class: NA <br /> <br />Rated Capacity: 7.500 LCY (heaped) <br />Bucket Fill Factor: 0.875 Loose material - 1 and over (85 - 90%) 0.875 <br />Adjusted Capacity: 6.563LCY <br /> <br /> <br />Job Condition Corrections: <br /> Site Altitude (ft.): 5300 feet <br /> <br /> Truck Loader Source <br />Altitude Adj: 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br /> <br />Net Correction: 0.830 0.830 <br /> <br /> Loading Tool Cycle Time: <br />Number of Loading Tool Passes Required to Fill Truck: 4 passes <br /> <br /> Excavators and Front Shovels: <br /> <br /> <br />Machine Cycle Time vs. Job Condition Rating: NA <br /> <br /> <br />Selected Value within this Basic Rating: NA <br /> <br />Track Loaders Material Description: <br /> <br />Cycle Time Elements (min.): <br /> <br />Load: NA Maneuver: NA Dump: 0.100 <br /> <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.550 minutes <br /> <br />Cycle Time Factors Factor (min.) Source <br />Material: Mixed material 0.02 0.020 (Cat HB) <br />Stockpile: Conveyor or dozer piled 10 ft. high or less 0.01 0.010 (Cat HB) <br />Truck Ownership: Common ownership of trucks and loaders -0.04 -0.040 (Cat HB) <br />Operation: Constant operation -0.04 -0.040 (Cat HB) <br />Dump Target: Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.050 minutes <br /> Adjusted Loader Cycle Time: 0.500 minutes <br /> Net Load Time per Truck: 1.600 minutes <br /> <br />Truck Cycle Time: <br /> <br />Truck Exchange Time: 0.60 Minutes Adjusted for site altitude: 0.600 Minutes <br />Truck Load Time: 1.600 Minutes Adjusted for site altitude: 1.600 Minutes <br />Truck Maneuver and Dump Time: 1.00 Minutes Adjusted for site altitude: 1.000 Minutes <br /> <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Very hard, smooth, asphalt or concrete, no tire <br />penetration 1.2 <br /> <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.