Laserfiche WebLink
<br />Page 1 of 3 <br /> <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Recontour CR65 Intersection <br /> <br />Site: Deserado Mine Permit Action: Permit Renewal 06 Permit/Job#: C1981018 <br /> <br />PROJECT IDENTIFICATION <br /> <br /> <br />Task #:010State:ColoradoAbbreviation:None <br /> <br />Date:7/16/2014County:Rio BlancoFilename:010 <br /> <br />User:JRS <br /> <br /> <br />: DRMS <br />Agency or organization name <br /> <br /> <br />HOURLY EQUIPMENT COST <br /> <br />Shift basis: 1 per day <br /> <br /> <br />Equipment Description <br />Truck Loader Team -Truck: Cat 770D <br />-Loader: CAT 980H <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: <br />Truck/Loader Team Support Equipment Maintenance Equipment <br />Water Truck <br />Truck Loader Load Area Dump Area Motor Grader <br /> <br />%Utilization-machine: 100 95 NA NA NA NA <br />Ownership cost/hour: $48.57 $43.89 NA NA NA NA <br />Operating cost/hour: $89.44 $72.75 NA NA NA NA <br />Ripper op. cost/hour: NA $0.00 NA NA NA NA <br />Operator cost/hour: $26.72 $37.13 NA NA NA NA <br />Unit Subtotals: $164.73 $153.77 NA NA NA NA <br />Number of Units: 3 1 0 0 0 0 <br />Group Subtotals: Work: $647.96 Support: $0.00 Maint: $0.00 <br /> <br />$647.96 <br />Total work team cost/hour: <br /> <br />MATERIAL QUANTITIES <br /> <br />Initial volume: 1,000 CCY Swell factor: 1.111 <br />Loose volume: 1,111LCY <br /> <br /> <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Operator Study <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br /> <br />HOURLY PRODUCTION <br /> <br /> <br />Truck Capacity: <br /> <br />Truck Payload (weight) Basis: <br /> <br /> Material weight:2,743Pounds/LCY <br /> Description: User Provided <br /> Rated Payload: 82,000 Pounds <br />Payload Capacity: 29.89 LCY <br /> <br /> <br />CIRCES Cost Estimating Software <br />