Laserfiche WebLink
Task # 010 Page 3 of 3 <br /> <br />Haul Route: <br />Travel <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity <br />Time <br />(Ft) (%) (%) (fpm) <br />(min) <br />1 5000.00 3.00 1.20 4.20 2051 2.704 <br /> <br />Haul Time: 2.704 minutes <br />Return Route: <br />Travel <br />Seg # Haul Distance Grade (%) Roll. Res Total Res Velocity <br />Time <br />(Ft) (%) (%) (fpm) <br />(min) <br />1 5000.00 -3.00 1.20 -1.80 4254 1.212 <br /> <br />Return Time: 1.212 minutes <br />Total Truck Cycle Time: 7.116 minutes <br /> <br />Loading Tool unit <br />Production 715.91 LCY/Hour Adjusted for job efficiency: 594.20 LCY/Hour <br />Truck Unit Production <br />221.33 LCY/Hour Adjusted for job efficiency: 183.71 LCY/Hour <br /> <br />Optimal No. of Trucks: 3 Truck(s) Selected Number of Trucks: 3 Truck(s) <br /> <br />Adjusted hourly truck team production: 551.12 LCY/Hour <br />Adjusted single truck/loader team production: 551.12 LCY/Hour <br />Adjusted multiple truck/loader team production: 551.12 LCY/Hour <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Team(s) Total job time: 2.02Hours <br /> <br /> <br />Unit cost: $1.176 /LCY Total job cost: $1,306 <br /> <br /> <br />CIRCES Cost Estimating Software <br />