Laserfiche WebLink
rWI <br />GQA ACTIVi` IF-I : <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement; underground working remediation and confirmatory drilling; production drilling and <br />blasting; SLF moisture content and density testing; sampling and testing of Drain Cover Fill (DCF) for <br />QC, sampling and testing of Soil Liner Fill (SLF) material for QA; and sampling and testing of <br />Structural Fill (SF) material for QA and QC; subgrade surface certification in the PSSA and Phase 2 <br />diversion channel; and SLF surface inspection and certification. <br />II) Laboratory Activities: Laboratory testing continued with permeability, particle size distribution, <br />Atterberg limits, moisture - density relationships, gradations, material classification, and field material <br />sampling were performed during this reporting period. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Y Drain Cover Fill sample number, DCF -96 (control sample). <br />Y Soil Liner Fill sample number, SLF -15 -R (record sample). <br />Y Structural Fill sample numbers, SF 88 -R & 89 -R (record samples). <br />General Proiect Items <br />Meetings and Discussions: Weekly Contractor Meeting — July 2, 2014 (CC &V, AMLG, Ames); CC &V <br />Weekly Safety Professional Meeting — July 3, 2014; EGA daily safety meetings; and Ames daily safety <br />meetings. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, <br />AMEC, and Ames. <br />Miscellaneous: <br />Y Drain cover fill crusher processing continued <br />Y Riprap screen processing continued <br />Y Soil liner fill placed at the PSSA was moisture conditioned <br />Y Highway 67 shoulder seeding continued <br />? Seeding and mulching the Area 34 topsoil stockpile <br />Deliveries: None <br />� <br />Submitted by: r� <br />Jul Date: Y 9 2014 <br />Bobby Redd, El <br />Reviewed by: (,-- >' "'��Yr - <br />Date: Judy 9, 2014 <br />Tim Burkhard <br />Project Resident <br />Phone: 719- 689 -2986 <br />CC &V Projects <br />Approved By: l �''- <br />Date: <br />Approved By: �'/'e'� (_. <br />Date: - / <br />2014.07.05 -rnle2 weekly final Page 4 of 7 <br />