Laserfiche WebLink
ATTACHMENT A <br />AMEC - 2014 CQA Field Staff Schedule MLE2 <br />AASM <br />• <br />Name <br />Sun. <br />Mon. <br />Tues. <br />Wed. <br />Thurs. <br />Fri. <br />Sat. <br />June 29 <br />June 30 <br />July 1 <br />July 2 <br />July 3 <br />July 4 <br />July 5 <br />Tim Burkhard <br />PR <br />PR <br />PR <br />PR <br />Mike Nelson <br />PM <br />Andrea MedUna <br />PE <br />Steve Rice <br />UG <br />_ <br />UG <br />UG <br />UG <br />_ <br />Ben Melly <br />GL <br />GL <br />GL <br />GL <br />Robert Redd <br />LS <br />LS <br />LS <br />LS <br />Tyler Browning <br />GT <br />GT <br />GT <br />Eric Lorenson <br />ST <br />ST <br />ST <br />ST <br />Razi Molloy <br />LT <br />LT <br />LT <br />LT <br />Denis Koval <br />ST <br />ST <br />ST <br />ST <br />Dylan Budreau <br />GT <br />GT <br />GT <br />GT <br />Al Frias <br />GT <br />GT <br />GT <br />GT <br />_ <br />Chad Schreiner <br />_ <br />GT <br />GT <br />GT <br />GT <br />LEGEND: <br />PL = Project Lead <br />PM = Project Manager <br />PCE = Project Certifying Engineer <br />PE = Project Engineer <br />PR = Project Resident <br />LG = Lead Geosynthetics Engineer <br />LS = Lead Soils Technician <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GL = Geosynthetics Lead <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />GS = Geophysics Survey Geologist <br />FlY = Highway Design Engineer <br />2014.07.05 -mle2 weekly final Page 5 of 7 <br />