2014-07-28_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-07-28_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:46:06 PM
Creation date
7/29/2014 1:50:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/28/2014
Doc Name
Weekly construction quality assurance report week ending 7/5/14, 7/12/14
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aft <br />Cameron Site for future use. The soil liner fill processing equipment remains at the Cameron site. <br />No new processing during this reporting period. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No work was performed on the secondary underdrain. <br />Tertiary Underdrain: Complete in PSSA footprint. <br />B) Underground Workings <br />Underground working #6631 was blasted. Additional remediation is required. <br />Confirmatory drilling of underground working #6579 was completed. Additional remediation is <br />required. <br />Confirmatory drilling of underground working #6318 began and is still in progress. <br />Coarse shaft backfill of underground working #,f6446 continued. Additional remediation is <br />required. <br />Completed geogrid placement at underground working 46119. Site remediated. <br />C) Geomembrane: <br />PSSA <br />Geomembrane installation within the PSSA continued this week performing deployment, <br />seaming, repair, and QA/QC activities. Geomembrane installation was performed at the ADR <br />pad, PSSA closure drain slopes and PSSA west slope. Approximately 140,300 square feet of <br />100mil LLDPE geomembrane was deployed. Subgrade was inspected and approved by AMEC, <br />Ames and ECA representatives prior to geomembrane deployment. Approximately 7,441 linear <br />feet of seam was fusion welded during deployment using one or two fusion welding machines for <br />each day of deployment. Destructive and non- destructive testing was completed per technical <br />specifications. <br />Ames continuously excavated anchor trench ahead of geomembrane installation. After <br />geomembrane testing was completed, the anchor trench above finished panels was backfilled <br />and compacted to project specifications. <br />Secondary liner panels S -1, S131 thru S -145, S -164 thru S -182, S -185, S -194 and S- <br />195(secondary 100mil LLDPE — 195,483 ft2) were accepted and approved for low volume <br />placement by AMEC, Ames and ECA representatives during this reporting period. Additional <br />repairs may be required prior to placement of low volume solution collection fill (ie. wrinkle <br />removal, sub -liner rock repair). <br />II) Storm Water Management <br />Best Management Practices (BMPs) are being performed. <br />2014.07.05 -mle2 weekly final Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.