Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#002 Page 2 of 2 <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1_SHIFT/DAY) <br /> Spoil pile: 0.800 (SSD-AC) _ <br /> Push gradient: _ 1.329 (CAT HB) <br /> Altitude: _ 1.000 (CAT HB) <br /> Material Weight: _ 0.793 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.4724 <br /> Adjusted unit production: 661.36 LCY/hr <br /> Adjusted fleet production: 661.36 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $0.316/LCY <br /> Total job time: 10.35 Hours <br /> Total job cost: $2,163 <br /> CIRCES Cost Estimating Software <br />