My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-16_REVISION - M2009024
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009024
>
2014-07-16_REVISION - M2009024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:29 AM
Creation date
7/17/2014 9:42:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009024
IBM Index Class Name
Revision
Doc Date
7/16/2014
Doc Name
FW Increase
From
DRMS
To
Oldcastle SW Group, Inc. dba Four Corners Materials
Type & Sequence
SI1
Email Name
KAP
BJC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagel of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Highwall Reduction,backfill <br /> Site: Simmons Pit Permit Action: 2014 Inspection Permit/Job#: M2009024 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 7/15/2014 County: Montezuma Filename: _M024-003 <br /> User: KAP <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: der day <br /> E ui ment Description <br /> -Scraper: Cat 637G w/ ush- ull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU — <br /> D <br /> Lump Area: NA _ <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: FNA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Tr—uck- <br /> %Utilization-machine: 100 NA 100 NA NA NA <br /> Ownership cost/hour: $110.90 NA $69.05 NA NA NA <br /> Operating cost/hour: $243.12 NA $108.22 NA NA NA <br /> Ripper op.cost/hour: NA NA $7.46 NA NA NA <br /> Operator cost/hour: $33.56 NA —$38.01 NA NA , NA <br /> Unit Subtotals: $387.59 NA $222.73 NA_ NA NA <br /> Number of Units: 2 --�---0 1 0 0 0 <br /> Group Subtotals: Work: $775.18 Support: $222.73 Maint: $0.00 <br /> Total work team cost/hour:$997.91 <br /> MATERIAL QUANTITIES <br /> Initial volume: 5,267 _ CCY Swell factor: 1.000 <br /> Loose volume: 5,267 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,650 lbs/LCY _ Struck Volume: 24.00 _ LCY <br /> Material description: Decomposed rock-25%Rock, Heaped Volume: 34.00 LCY <br /> 75%Earth _ <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 30.79 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.