Laserfiche WebLink
Pagel of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Highwall Reduction,backfill <br /> Site: Simmons Pit Permit Action: 2014 Inspection Permit/Job#: M2009024 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 7/15/2014 County: Montezuma Filename: _M024-003 <br /> User: KAP <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: der day <br /> E ui ment Description <br /> -Scraper: Cat 637G w/ ush- ull <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU — <br /> D <br /> Lump Area: NA _ <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: FNA <br /> Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Tr—uck- <br /> %Utilization-machine: 100 NA 100 NA NA NA <br /> Ownership cost/hour: $110.90 NA $69.05 NA NA NA <br /> Operating cost/hour: $243.12 NA $108.22 NA NA NA <br /> Ripper op.cost/hour: NA NA $7.46 NA NA NA <br /> Operator cost/hour: $33.56 NA —$38.01 NA NA , NA <br /> Unit Subtotals: $387.59 NA $222.73 NA_ NA NA <br /> Number of Units: 2 --�---0 1 0 0 0 <br /> Group Subtotals: Work: $775.18 Support: $222.73 Maint: $0.00 <br /> Total work team cost/hour:$997.91 <br /> MATERIAL QUANTITIES <br /> Initial volume: 5,267 _ CCY Swell factor: 1.000 <br /> Loose volume: 5,267 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,650 lbs/LCY _ Struck Volume: 24.00 _ LCY <br /> Material description: Decomposed rock-25%Rock, Heaped Volume: 34.00 LCY <br /> 75%Earth _ <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 30.79 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />