Laserfiche WebLink
Page 1 of 2 <br /> BULLDOZER WORK <br /> Task description: Highwall Reduction,balanced cut and fill <br /> Site: Simmons Pit _ Permit Action: 2014 Inspection Permit/Job#: M2009024 <br /> PROJECT IDENTIFICATION <br /> Task#: 002 __ _ State: Colorado _ Abbreviation: None _ <br /> Date: 7/15/2014 , County: _Montezuma _ Filename: M024-002 <br /> User: KAP _ -- <br /> Agency or organization name: DBMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU <br /> Horsepower: 310 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per dam <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $62.67 NA <br /> Operating Cost/Hour: $108.22 100 _ <br /> Ripper op.Cost/Hour: $0.00 0 _ <br /> Operator Cost/Hour: $38.01 NA <br /> Total unit Cost/Hour: $208.90 <br /> Total Fleet Cost/Hour: $208.90 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 6,847 <br /> Swell factor: 1.000 <br /> Loose volume: 6,847 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 50 feet <br /> Unadjusted hourly production: 1,400.0 LCY/hr <br /> Materials consistency description: Compacted fill or embankment 0.9 <br /> Average push gradient: -15 % <br /> Average site altitude: 6,870 feet <br /> Material weight: 2,9001bs/LCY <br /> Weight description: Decomposed rock-50%Rock,50%Earth <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 (AVG.) <br /> Material consistency: 0.900 (CAT HB)) _ <br /> Dozing method: _ 1.000 (GEN•) �s <br /> CIRCES Cost Estimating Software <br />