My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-16_REVISION - M2009024
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009024
>
2014-07-16_REVISION - M2009024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:29 AM
Creation date
7/17/2014 9:42:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009024
IBM Index Class Name
Revision
Doc Date
7/16/2014
Doc Name
FW Increase
From
DRMS
To
Oldcastle SW Group, Inc. dba Four Corners Materials
Type & Sequence
SI1
Email Name
KAP
BJC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task#005 Page 2 of 2 <br /> Cycle Time: <br /> Scraper Loading Time: 1.00 Minutes <br /> Maneuver and Spread Time: 0.60 Minutes <br /> Job Condition Correction: Site Altitude:6870 feet <br /> Scraper Push Dozer Source _ <br /> Altitude Adj: 1.000 NA CAT HB <br /> Job Efficienc : } 0.836 NA CAT HB <br /> Net Correction: 0.830 NA <br /> Travel Time: <br /> Road Condition: Soft,rutted dirt,no maintenance or water,4"tire penetration 8.0 <br /> Haul Route: <br /> Seg# Haul Distance(Ft) f Grade Roll.Res - Total Res Velocity(fpm) Travel Time <br /> (/o /-� /o _ (min) <br /> 1 1440.00 v2.40 8.00 10.40 -922 1.59 <br /> Haul Time: 1.59 minutes <br /> Return Route: _ _ <br /> Seg# Haul Distance(Ft) Grade Roll.Res Total Res Velocity(fpm) Travel Time <br /> %� _ (min) <br /> 1 1440.00 -2.40 8.00 5.60 1 2638 1 0.71 <br /> Return Time: 0.71 minutes <br /> Total Scraper team cycle time: 3.90 minutes <br /> Adjusted for job conditions: _ 740.62 LCY/Hour <br /> Selected Number of Scrapers: _ 2 Scraper(s) <br /> Adjusted single scraper team(unit)hourly production: 740.62 LCY/Hour <br /> Adjusted multiple scraper team(fleet)hourly production: 740.62 LCY/Hour <br /> Unadjusted unit production/hour: 892.31 _ LCY/Hour <br /> Optimal Number of Scrapers per push dozer: <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 71.17 Hours <br /> Unit cost: $1.047 , /LCY Total job cost: $55,168 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.