Laserfiche WebLink
Pagel of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace OVB for Mine Areas 1 and 2 <br /> Site: Simmons Pit Permit Action: 2014 Inspection Petmit/Job#: M2009024 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 _ State: Colorado Abbreviation: None <br /> Date: 7/15/2014 County: Montezuma Filename: M024-005 <br /> User: KAP <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: I per day <br /> _ Equipment Description _ <br /> -Scraper: Cat 637G w/push-pull <br /> -Dozer: NA <br /> Support Equipment-Load Area- NA _ <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: I NA <br /> -Water Truck: ~NA <br /> Cost Breakdown: _Scraper Work Team _Support Equipment Maintenance Equipment <br /> TScraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA___ NA NA NA NA <br /> Ownership cost/hour: $110.90 NA NA NA �— NA NA <br /> Operating cost/hour: $243.1 _ NA ! NA NA <br /> p g �_ _ , NA NA <br /> Ripper op.cost/hour: NA NA NA NA NA NA <br /> _ Operator cost/hour: j $33.56 �' NA NA NA NA ( NA <br /> Unit Subtotals: $387.59 NA NA NAi NA NA <br /> Number of Units: 2 0 0 0 0 0 <br /> Group Subtotals: Work: $775.18 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour:$775.18 <br /> MATERIAL QUANTITIES <br /> Initial volume: 52,708 CCY Swell factor: 1.000 _ <br /> Loose volume: 52,708 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,650 lbs/LCY _ Struck Volume: 24.00 LCY <br /> Material description: Decomposed rock-25%Rock, Heaped Volume: 34.00 LCY <br /> 75%Earth <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 30.79 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />