Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#004 Page 2 of 2 <br /> Visibility: 1.000 _ -� (AVG.) _ <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (SSD-AC) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 0.793 (CAT HB) _ <br /> Blade type: _ 1.000 —� (PAT) <br /> Net correction: 0.3554 <br /> Adjusted unit production: 497.56 LCY/hr <br /> Adjusted fleet production: 497.56 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: I Dozer(s) <br /> Unit cost: $0.420/LCY <br /> Total job time: 24.38 Hours <br /> Total job cost: $5,094 <br /> CIRCES Cost Estimating Software <br />