My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-16_REVISION - M2009024
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009024
>
2014-07-16_REVISION - M2009024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:29 AM
Creation date
7/17/2014 9:42:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009024
IBM Index Class Name
Revision
Doc Date
7/16/2014
Doc Name
FW Increase
From
DRMS
To
Oldcastle SW Group, Inc. dba Four Corners Materials
Type & Sequence
SI1
Email Name
KAP
BJC
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Replace Topsoil 12 inches deep over Mine Areas I and 2 <br /> Site: Simmons Pit_ _ Permit Action: 2014 Inspection Permit/Job#: M2009024 <br /> PROJECT IDENTIFICATION <br /> Task#: 006 State: Colorado Abbreviation: None _ <br /> Date: 7/15/2014 County: Montezuma _ Filename: M024-006 <br /> User: KAP — <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G w/push-pull <br /> _ -Dozer: NA <br /> Support Equipment-Load Area: NA <br /> -Dungy Area: NA _ <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: _Scraper Work Team _Support Equip ment Maintenance Equipment <br /> Scraper Dozer T Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 _ NA NA NA NA NA <br /> Ownership cost/hour: $110.90 NA NA NA NA NA <br /> Operating cost/hour: $243.12 NA NA NA NA NA <br /> Ripper op.cost/hour: NA NA NA NA NA NA <br /> Operator cost/hour: I $33.56 NA NA — NA NA NA — <br /> Unit Subtotals: $387.59 NA NA NA NA NA <br /> Number of Units: ` 2 0 0 _0 0 0 <br /> Group Subtotals: j Work: $775.18 Support: —$0.00 Maint: $0.00 <br /> Total work team cost/hour:S775.18 <br /> MATERIAL QUANTITIES <br /> Initial volume: 17,569 CCY Swell factor: 1.125 _ <br /> Loose volume: 19,765 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: _2,550 lbs/LCY __ Struck Volume: 24.00 LCY <br /> Material description: Earth-Dry packed __ Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 32.00 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.