Laserfiche WebLink
Lindsay M. Griffith, P.E. Page 2 <br /> July 10, 2014 <br /> In accordance with approach nos. 1 and 3, a bond has been obtained for <br /> $6,268,550.00 through the Division of Reclamation, Mining,and Safety("DRMS")to <br /> assure that depletions from groundwater evaporation do not occur in the unforeseen <br /> event, or events, that would lead to the abandonment of the Pit. <br /> Depletions <br /> Depletions at the Holcim Quarry consist of evaporative losses and operational losses <br /> due to dust control and water removed within the mined product. As mentioned above the <br /> Applicant is seeking to use the remainder of the changed Porter Ditch water right from Case No. <br /> 92CW35 to cover a portion of the evaporation losses from the other ponds on the Holcim Quarry <br /> DRMS permitted boundary after the Duck Pond depletions have been augmented.As regards <br /> the Duck Pond,the decree in Case No. 92CW35 allows for up to 8.3 acres of exposed groundwater <br /> and the associated evaporation depletions from the 8.3-acre pond are identified as 31.13 acre-feet <br /> per year. Currently, the exposed groundwater surface area for the Duck Pond is approximately 5.6 <br /> acres,while the area of the exposed water at the other three quarry pond areas is currently 7.45 acres <br /> (see attached table). Therefore, only 4.8 acres of the other pond areas would need replacement with <br /> Upper Ark water. <br /> Operational losses include dust suppression and water removed in the mined product. <br /> Projected dust suppression needs for the 2014 plan year are.estimated to total 12.00 AF from <br /> the Duck Pond and 46.44 AF from the other quarry ponds. Evaporative consumptive use from <br /> the 4.8 acres remaining after the changed Porter Ditch water right has been exhausted totals <br /> 16.96 AF, bringing the total depletions to 63.40 acre-feet. <br /> The total depletions for this SWSP, as shown in the attached Table 2, are estimated to <br /> be 54.82 acre-feet. The 54.82 acre-feet does not include the evaporation losses since these <br /> depletions are covered by the evaporation loss component of the changed Porter Ditch water <br /> right from Case No. 92CW35. <br /> Replacements <br /> The evaporation losses for the pond areas, up to 31.13 acre-feet,will be covered by the <br /> evaporation loss component of the changed Porter Ditch water right from Case No. 92CW35. <br /> The remainder of the evaporation losses plus the operational losses, consisting of 63.4 acre- <br /> feet, will be replaced from the lease with Upper Arkansas Water Conservancy District. The lease <br /> water will be provided from stored water in Twin Lakes Reservoir, or from any other reservoir or <br /> place from which the Upper Arkansas Water Conservancy District may legally deliver water, from <br /> storage or by exchange. <br /> Conditions of Approval <br /> I hereby approve the proposed SWSP in accordance with § 37-92-308(5), C.R.S., <br /> subject to the following conditions: <br /> 1. This SWSP shall be valid for the period of January 1, 2014 through December 31, 2014, <br /> unless otherwise revoked, modified, or superseded by decree. Additional SWSPs are <br /> required until a court decreed plan for augmentation is obtained for the proposed uses. <br />