For the worst case topsoil replacement, the following calculation is made: <br />Atlas area = 4.53 ac. <br />Revenue Pile area = 10.21 ac — 0.35 ac for Mine water pond to be left = 9.86 ac. <br />NE rangeland area = 0.97 ac <br />SE rangeland area = 1.06 ac <br />Total: 16.42 ac <br />Using 6 inches thickness, this is an amount of 13,245 cy. Since there is 3045 cy available from the <br />Atlas pile footprint, the amount of imported soil needed is 10,200 cy. <br />This area of 16.42 acres is also the area for site seeding and mulching. <br />Since the reclamation plan does not call for the removal of all surface facilities, and the Atlas <br />waste area will not have been developed yet, related reclamation will not be necessary. A detailed <br />breakdown of each task and its associated cost is shown in Table L -1. <br />Details of main building construction details built as of September 2013 are shown below: <br />• Dry Room Building <br />0 47' wide x 50' long x 28' tall "at peak" <br />o Monolithic slab w/ pre footer. Grade Beam: 16" wide x 18" deep, Slab is 6" thick <br />• RCM50 Rustable metal siding and roofing <br />• In -Floor Radiant and Baseboard heating <br />• Spray Foam Insulation <br />• Propane Boiler Heat <br />• The Dry room and office has showers, lockers, toilets, sinks, offices on the second <br />floor <br />Revenue Mine June 2014 L -3 <br />