Laserfiche WebLink
• Filter Building <br />• 56' wide x 92' long x 35' tall "at peak" <br />• Rat slab to bedrock, Micropyles under columns, Footers, 12' Walls and Slab <br />• Rat slab: up to 5' of concrete over bedrock — one row of #5 rebar <br />• Footers: 2436" footers <br />• Walls: 18" thick by 12' tall <br />• Slab: 8" thick <br />• RCM50 Rustable metal siding and roofing <br />• In -Floor Radiant and Baseboard heating <br />• Spray Foam Insulation <br />• Propane Boiler Heat <br />• The filter building has filter presses for dewatering the fine tailings prior to disposal. <br />• Switch Gear Building <br />• 25' wide x 30' long x 17' high "at peak" <br />• Rat Slab and Monolithic /Grade Beam Foundation <br />• Rat Slab: up to 5' thick to bedrock <br />• Monolithic Slab: Grade beam: 18 "w x 30 "d <br />• Slab: 8" thick <br />• RCM50 Rustable metal siding and roofing <br />• No heat source <br />• R -Max Rigid Foam Board and Spray Foam Insulation <br />• The switch gear building has the transformers and switch gear that are used to <br />supply the voltage needed for all site uses <br />IN <br />• Battery Charging Building <br />0 45' wide x 120' long x 24' tall "at peak" <br />o Micropyle, Footer and Slab Foundation "dimensions TBD" <br />0 RCM50 Rustable metal siding and roofing <br />o In -Floor Radiant, Forced Air and Baseboard heating <br />Revenue Mine June 2014 L -4 <br />