Laserfiche WebLink
Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Page 22 of 39 <br />1.000 <br />CAT HB <br />1.000 <br />GEN. <br />1.000 <br />AVG. <br />0.830 <br />(1 SHIFT/DAY) <br />0.700 <br />(FND -MF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.807 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.3517 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />658.38 LCY/hr <br />658.38 LCY/hr <br />Fleet size: <br />1 Dozer(s) <br />Unit cost: <br />$0.388/LCY <br />Total job time: <br />0.60 Hours <br />Total job cost: <br />$152.14 <br />CIRCES Cost Estimating Software <br />