Laserfiche WebLink
Page 21 of 39 <br />BULLDOZER WORK <br />Task description: Push topsoil to powder magazine <br />Site: Keenesburg Strip Mine Permit Action: MT6 Permit/Job #: 0981028 <br />PROJECT IDENTIFICATION <br />Task #: E03 State: Colorado <br />Date: 3/26/2014 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: CO28 -E03 <br />Total unit Cost/Hour: $255.39 <br />Total Fleet Cost/Hour: $255.39 <br />MATERIAL QUANTITIES <br />Initial Volume: 370 <br />Swell factor: 1.060 <br />Loose volume: 392 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 60 feet <br />Unadjusted hourly 1,872.0 LCY/hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 4,000 feet <br />Material weight: 2,8501bs/LCY <br />Weight description: Sand - Damp <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$146.66 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.85 <br />NA <br />Total unit Cost/Hour: $255.39 <br />Total Fleet Cost/Hour: $255.39 <br />MATERIAL QUANTITIES <br />Initial Volume: 370 <br />Swell factor: 1.060 <br />Loose volume: 392 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 60 feet <br />Unadjusted hourly 1,872.0 LCY/hr <br />production: <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: 0% <br />Average site altitude: 4,000 feet <br />Material weight: 2,8501bs/LCY <br />Weight description: Sand - Damp <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />