Laserfiche WebLink
Page 23 of 39 <br />SCRAPER TEAM WORK <br />Task description: Topsoil facilities area <br />Site: Keenesburg Strip Mine Permit Action: RN6 <br />PROJECT IDENTIFICATION <br />Task #: E04 State: Colorado <br />Date: 3/26/2014 County: Weld <br />User: JLE <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance Motor Grader: NA <br />-Water Truck: NA <br />Permit/Job #: C1981028 <br />Abbreviation: None <br />Filename: CO28 -E04 <br />COSTShift basis: 1 per day <br />iption <br />C'net Rrvakdnwrr Crraner Wnrk Team Runnnrt F.nuinment Maintenance Equipment <br />Total work team cost/hour: $1,173.59 <br />MATERIAL QUANTITIES <br />Initial volume: 4,630 CCY Swell factor: 1.060 <br />Loose volume: 4,908 LCY <br />Source of estimated volume: Permit commitment; 6 inches topsoil <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />25 <br />100 <br />NA <br />NA <br />Ownership cost/hour: <br />$100.38 <br />NA <br />$69.88 <br />$78.33 <br />NA <br />NA <br />Operating cost/hour: <br />$242.98 <br />NA <br />$36.67 <br />$146.66 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$38.82 <br />NA <br />$38.85 <br />$38.85 <br />NA <br />NA <br />Unit Subtotals: <br />$382.18 <br />NA <br />$145.39 <br />$263.84 <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />1 <br />1 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$764.36 <br />Support: <br />$409.23 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $1,173.59 <br />MATERIAL QUANTITIES <br />Initial volume: 4,630 CCY Swell factor: 1.060 <br />Loose volume: 4,908 LCY <br />Source of estimated volume: Permit commitment; 6 inches topsoil <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />2,850 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Sand - Damp <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />28.63 LCY <br />Adjusted Capacity: <br />28.63 <br />LCY <br />CIRCES Cost Estimating Software <br />