Laserfiche WebLink
June 24, 2014 C-1980-004/McClane Canyon Mine ZTT <br /> <br /> <br /> <br />Vegetation covering clean water culvert. <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br />The construction equipment and power lines poles have been moved to a proper area. Oil drums found in the lay <br />down area in the previous inspection have been removed from the area. <br /> <br />Multiple maintenance items were noted in the previous inspection report that was required for compliance. During <br />this inspection, all items have been addressed and/or currently being addressed during the time of this inspection. <br />No remaining items are needed to be addressed at the time of this inspection report. <br /> <br />Oil drums removed from area. <br /> <br />PROCESSING WASTE/COAL MINE WASTE PILES Rule 4.10 and 4.11 <br />Drainage Control; Surface Stabilization; Placement: <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br />48 <br />Page of <br /> <br /> <br />