Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company ((r�,0 <br /> A Joint Venture-ANGLOGOLD ASHANTI(COLORADO)CORP., Manager O , A �I s <br /> Operations Office <br /> P.O. Box 191 - 100 North 3`d Street , <br /> V" Victor,Colorado 80860 <br /> (719)689-2977—Fax(719)689-3254 • <br /> Q <br /> �Pa�Leade'r°'�4 <br /> SENT CERTIFIED,RETURN RECEIPT REQUESTED <br /> 7011-0470-0000-483 3-9766 <br /> June 16,2014 JUN 16, c <br /> Lynda Morgan Division of Reoil, (i <br /> Director of Community Development Services Division Mining&sw*�ty <br /> Teller County <br /> P.O. Box 1886 <br /> Woodland Park,CO 80866 <br /> Re: Minor Modification(Appendix A-Section 8.B)of Cripple Creek and Victor Gold Mining <br /> (CCV)Permit No.M-1980-244—Mine Development Plan(MDP)for the Crusher Power Line <br /> Dear Ms.Morgan, <br /> The Department f Reclamation,Mining and Safety(DRMS)is requiring CC&V to do a Technical <br /> Revision(TR-7Ato cover the construction of a new power line from the substation on the west side of <br /> Highway 67 across from the Carlton entrance to the crusher. Additionally,Black Hills has received a <br /> Utility Permit from CDOT for the Highway 67 crossing(see attached DRMS application). <br /> CC&V has reviewed the proposed project against CCMOD 8.13.3 to determine if a Minor Modification is <br /> appropriate: <br /> a. The proposed power line is all on land previously disturbed by permitted activities at CC&V. <br /> b. All portions of the power are within the MLE-2 Permit boundary. <br /> c. The warranty estimate has been update to include reclamation of the power line(see attached TR- <br /> 72 application). <br /> d. Construction of the power line would place no additional burden on Teller County. <br /> e. Closely paralleling the existing Black Hills power from the additional line creates no additional <br /> impact. <br /> f. Under point 12 of S7,the warranty for reclamation will be increased to accommodate removal of <br /> the line. <br /> g. Addition of the power line fits within the scope of the MDP. <br /> h. This activity but not the particulars are within the scope of the MDP. <br /> Based on this evaluation,the warranty for reclamation will be increased to accommodate the proposed <br /> addition of the power line from the Carlton gate a Minor Modification maybe appropriate. Further after <br /> discussions with Lor Pellegrino—Senior Planner,she felt an application for a Minor Modification was <br /> appropriate because there will be a Technical Revision required with the State of Colorado rather than a <br /> Page 1 <br />