2014-06-18_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-06-18_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 7:07:29 AM
Creation date
6/18/2014 2:25:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/18/2014
Doc Name
Weekly CQA Report- Weeks ending 05/31/14 and 6/7/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec' ' , <br /> A Cat excavator began anchor trench excavation on the 9,450 elevation between stations AO+00 <br /> to A4+50. <br /> SLF Processing: <br /> Cameron Site: No soil liner fill mining or processing occurred at the Cameron Site. <br /> Approximately 244,860 tons of SLF material has been produced and remains stockpiled at the <br /> Cameron Site for future use. <br /> Squaw Gulch Borrow Site: Soil liner fill mining and processing was completed at the Squaw <br /> Gulch Clay Borrow Site (the source was depleted). Approximately 143,198 tons of soil liner fill <br /> material was produced. The soil liner fill processing equipment will be transferred back to the <br /> Cameron site. <br /> Underdrain System: <br /> Primary Underdrain: Work was completed for the primary underdrain on May 23, 2014_ <br /> Secondary Underdrain: No work was performed on the secondary underdrain. <br /> Tertiary Underdrain: Approximately 500 feet tertiary underdrain was completed on the eastern <br /> slope of the PSSA below station B4+00. <br /> B) Underground Workings <br /> Confirmatory drilling was conducted at underground workings#6119 and#6260. Both sites will <br /> be blasted and additional remediation is required. <br /> Excavation at underground workings 96625 and#6627 began. Additional remediation is <br /> required. <br /> Underground workings#6559, #6564, #6573,#6574, #6575,#6608,#6622,#6623, #6624, and <br /> #6626 were excavated to competent rock, backfilled according to project specifications, and are <br /> considered remediated. <br /> II) Storm Water Management <br /> Best Management Practices(BMPs) are being performed. <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; underground working remediation and confirmatory drilling; production drilling and <br /> blasting; SLF moisture content and density testing; sampling and testing of leak detection fill (LDF)for <br /> quality control and quality assurance (QA and QC); sampling and testing of drain cover fill (DCF)for <br /> QC, and sampling and testing of SLF material for QA and QC; subgrade certification in the PSSA; <br /> SLF inspection and certification; and tertiary underdrain installation. <br /> 11) Laboratory Activities: Laboratory testing continued with permeability, particle size distribution, <br /> Atterberg limits, moisture-density relationships, gradations, material classification, point load, specific <br /> gravity, and field material sampling were performed during this reporting period. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> Drain Cover Fill sample number DCF-85 and DCF-86 (control samples). <br /> Soil Liner Fill sample numbers SLF 152-S through SLF-155-S (control samples). <br /> 2014 06 07-mle2 weekly final Page 3 of 7 <br />