Laserfiche WebLink
amet".'' <br /> ➢ Soil Liner Fill sample numbers SLF 1-R and SLF 2-R(record samples). <br /> ➢ Leak Detection Fill sample number LDF-1-C (control sample) <br /> ➢ Leak Detection Fill sample number LDF-1-R (record sample) <br /> ➢ Phonolite rock samples for riprap suitability <br /> ➢ Concrete cylinders were cast for compressive strength testing from the closure drain collars <br /> General Project Items <br /> Meetings and Discussions: The weekly Contractor Meeting occurred on June 4, 2014 with CC&V <br /> Projects,AMEC, and Ames. <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting and scheduling are some of the tasks occurring between CC&V Projects; <br /> AMEC; and Ames. <br /> Miscellaneous: <br /> Y Drain cover fill crusher processing continued <br /> Riprap screen processing continued <br /> Soil liner fill placed at the PSSA was moisture conditioned <br /> 62 rolls of liner were moved from the staging area above the Phase 2 Diversion Channel to the <br /> security complex pad on the southeast side of the PSSA <br /> ECA began mobilizing to site in preparation for geomembrane liner operations <br /> No delays were reported due to inclement weather <br /> Deliveries: None <br /> Submitted by: Eric-tb-_renson Date: June 11,2014 <br /> Reviewed by: Date: June 11,2014 <br /> Tim Burkha <br /> Pro�j t Resident <br /> Ph e: 719-689-2986 <br /> CC�V Projects <br /> Date: <br /> Ap roved By: <br /> Approv\eq By. Date: <br /> 2054.06.07-mfe2 weekly final Page 4 of 7 <br />