My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-06-18_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-06-18_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2020 7:07:29 AM
Creation date
6/18/2014 2:25:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
6/18/2014
Doc Name
Weekly CQA Report- Weeks ending 05/31/14 and 6/7/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amet".'' <br /> ➢ Soil Liner Fill sample numbers SLF 1-R and SLF 2-R(record samples). <br /> ➢ Leak Detection Fill sample number LDF-1-C (control sample) <br /> ➢ Leak Detection Fill sample number LDF-1-R (record sample) <br /> ➢ Phonolite rock samples for riprap suitability <br /> ➢ Concrete cylinders were cast for compressive strength testing from the closure drain collars <br /> General Project Items <br /> Meetings and Discussions: The weekly Contractor Meeting occurred on June 4, 2014 with CC&V <br /> Projects,AMEC, and Ames. <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting and scheduling are some of the tasks occurring between CC&V Projects; <br /> AMEC; and Ames. <br /> Miscellaneous: <br /> Y Drain cover fill crusher processing continued <br /> Riprap screen processing continued <br /> Soil liner fill placed at the PSSA was moisture conditioned <br /> 62 rolls of liner were moved from the staging area above the Phase 2 Diversion Channel to the <br /> security complex pad on the southeast side of the PSSA <br /> ECA began mobilizing to site in preparation for geomembrane liner operations <br /> No delays were reported due to inclement weather <br /> Deliveries: None <br /> Submitted by: Eric-tb-_renson Date: June 11,2014 <br /> Reviewed by: Date: June 11,2014 <br /> Tim Burkha <br /> Pro�j t Resident <br /> Ph e: 719-689-2986 <br /> CC�V Projects <br /> Date: <br /> Ap roved By: <br /> Approv\eq By. Date: <br /> 2054.06.07-mfe2 weekly final Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.